Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2019 |
Principal Product | Steering Wheels and Injection Molds |
NAICS | 336330 - Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $100,000,000-$500,000,000 |
# of Employees | 866 |
Plant Area (Sq.Ft.) | 400,000 |
Annual Production | 1,500,000 Units |
Production Hrs. Annual | 6,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,537,676 | 24,108,790 | kWh | $0.06 |
Electricity Demand | $93,189 | 45,849 | kW-months/year | $2.03 |
Natural Gas | $257,700 | 48,689 | MMBtu | $5.29 |
TOTAL ENERGY COSTS | $1,888,565 | |||
RECOMMENDED SAVINGS* | $230,305 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $84,727 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $5,924 Cost: - |
$5,522 | 104,658 | $402 | 198 | - | - | - | - |
$5,522 104,658 kWh |
$402 198 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $12,364 Cost: - |
$12,364 | 234,349 | - | - | - | - | - | - |
$12,364 234,349 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $8,727 Cost: $7,000 |
$8,727 | 165,415 | - | - | - | - | - | - |
$8,727 165,415 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $60,472 Cost: $17,300 |
$56,151 | 1,064,272 | $4,321 | 2,123 | - | - | - | - |
$56,151 1,064,272 kWh |
$4,321 2,123 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $17,400 Cost: $27,000 |
$17,400 | 329,796 | - | - | - | - | - | - |
$17,400 329,796 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $10,359 Cost: $2,540 |
$(-1,752) | (-33,216) | $(-135) | (-67) | $12,246 | 2,315 | - | - |
$(-1,752) (-33,216) kWh |
$(-135) (-67) kW-months/year |
$12,246 2,315 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,640 Cost: $4,000 |
$2,451 | 46,468 | $189 | 92 | - | - | - | - |
$2,451 46,468 kWh |
$189 92 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1123 INSTALL AUTOMATIC STACK DAMPER |
Savings: $19,943 Cost: $1,000 |
- | - | - | - | $19,943 | 3,770 | - | - |
- - kWh |
- - kW-months/year |
$19,943 3,770 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $26,037 Cost: $50,514 |
- | - | - | - | $26,037 | 4,922 | - | - |
- - kWh |
- - kW-months/year |
$26,037 4,922 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $66,439 Cost: $164,220 |
$57,837 | 1,096,220 | $4,451 | 2,192 | - | - | $4,151 | - |
$57,837 1,096,220 kWh |
$4,451 2,192 kW-months/year |
- - MMBtu |
$4,151 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $230,305 Cost: $273,574 |
$158,700 | 3,007,962 | $9,228 | 4,539 | $58,226 | 11,007 | $4,151 | - | $158,700 3,007,962 kWh |
$9,228 4,539 kW-months/year |
$58,226 11,007 MMBtu |
$4,151 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $84,727 Cost: $164,220 |
$75,723 | 1,435,227 | $4,853 | 2,390 | - | - | $4,151 | - | $75,723 1,435,227 kWh |
$4,853 2,390 kW-months/year |
- - MMBtu |
$4,151 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |