Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
369
matching recommendationsNAICS | 33635 | Motor Vehicle Transmission and Power Train Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0323 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $315 | $180 | n/a |
TT0323 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,604 | $2,430 | n/a |
TT0323 # 06 Y:2025 | 06 | 2025 | UTILIZE OUTSIDE CONTRACTING | $27,937 | $30,000 | n/a |
TT0323 # 07 Y:2025 | 07 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $12,931 | $18,000 | n/a |
TT0323 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $451 | $0 | n/a |
TT0323 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,234 | $2,520 | n/a |
TT0323 # 08 Y:2025 | 08 | 2025 | USE SOLAR HEAT FOR HEAT | $26,365 | $221,500 | n/a |
TT0323 # 03 Y:2025 | 03 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,028 | $400 | n/a |
MU0045 # 01 Y:2024 | 01 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,629 | $0 | Not Implemented |
MU0045 # 11 Y:2024 | 11 | 2024 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,256 | $1,302 | Not Implemented |
MU0045 # 06 Y:2024 | 06 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,088 | $0 | Implemented |
MU0045 # 10 Y:2024 | 10 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $5,014 | $4,165 | Not Implemented |
MU0045 # 13 Y:2024 | 13 | 2024 | MINIMIZE WATER USAGE | $60,609 | $146,420 | Not Implemented |
MU0045 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,694 | $706 | Implemented |
MU0045 # 08 Y:2024 | 08 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,871 | $0 | Implemented |
MU0045 # 09 Y:2024 | 09 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $38,860 | $12,105 | Not Implemented |
MU0045 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,606 | $17 | Implemented |
MU0045 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,005 | $34,270 | Not Implemented |
MU0045 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,936 | $18,703 | Not Implemented |
MU0045 # 12 Y:2024 | 12 | 2024 | MINIMIZE WATER USAGE | $25,914 | $8,239 | Not Implemented |
MU0045 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $14,981 | $56,840 | Not Implemented |
MU0045 # 14 Y:2024 | 14 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $4,768 | $0 | Not Implemented |
GT0977 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $72,598 | $1,299,381 | Not Implemented |
GT0977 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,327 | $12,892 | Implemented |
GT0977 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,128 | $14,000 | Implemented |