Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
133
matching recommendationsNAICS | 33635 | Motor Vehicle Transmission and Power Train Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0323 # 08 Y:2025 | 08 | 2025 | USE SOLAR HEAT FOR HEAT | $26,365 | $221,500 | n/a |
TT0323 # 03 Y:2025 | 03 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,028 | $400 | n/a |
TT0323 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $315 | $180 | n/a |
TT0323 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $451 | $0 | n/a |
TT0323 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,234 | $2,520 | n/a |
TT0323 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,604 | $2,430 | n/a |
TT0323 # 07 Y:2025 | 07 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $12,931 | $18,000 | n/a |
TT0323 # 06 Y:2025 | 06 | 2025 | UTILIZE OUTSIDE CONTRACTING | $27,937 | $30,000 | n/a |
MU0045 # 12 Y:2024 | 12 | 2024 | MINIMIZE WATER USAGE | $25,914 | $8,239 | Not Implemented |
MU0045 # 10 Y:2024 | 10 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $5,014 | $4,165 | Not Implemented |
MU0045 # 11 Y:2024 | 11 | 2024 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,256 | $1,302 | Not Implemented |
MU0045 # 09 Y:2024 | 09 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $38,860 | $12,105 | Not Implemented |
MU0045 # 08 Y:2024 | 08 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,871 | $0 | Implemented |
MU0045 # 13 Y:2024 | 13 | 2024 | MINIMIZE WATER USAGE | $60,609 | $146,420 | Not Implemented |
MU0045 # 14 Y:2024 | 14 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $4,768 | $0 | Implemented |
MU0045 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,606 | $17 | Implemented |
MU0045 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $14,981 | $56,840 | Not Implemented |
MU0045 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,694 | $706 | Implemented |
MU0045 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,936 | $18,703 | Not Implemented |
MU0045 # 01 Y:2024 | 01 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,629 | $0 | Not Implemented |
MU0045 # 06 Y:2024 | 06 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,088 | $0 | Implemented |
MU0045 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,005 | $34,270 | Not Implemented |
GT0977 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $72,598 | $1,299,381 | Not Implemented |
GT0977 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,128 | $14,000 | Implemented |
GT0977 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,957 | $1,500 | Implemented |