Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
256
matching recommendationsNAICS | 336360 | Motor Vehicle Seating and Interior Trim Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0423 # 06 Y:2016 | 06 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $928 | $2,300 | Not Implemented |
LE0423 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $961 | $2,575 | Not Implemented |
LE0423 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $1,518 | $6,016 | Not Implemented |
LE0423 # 09 Y:2016 | 09 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,028 | $24,500 | Not Implemented |
LE0423 # 10 Y:2016 | 10 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,325 | $18,675 | Not Implemented |
IP0069 # 01 Y:2016 | 01 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $490 | $0 | Implemented |
IP0069 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,282 | $21 | Implemented |
IP0069 # 03 Y:2016 | 03 | 2016 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $5,637 | $3 | Not Implemented |
IP0069 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $9,327 | $377 | Implemented |
IP0069 # 05 Y:2016 | 05 | 2016 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $50 | $5 | Not Implemented |
IP0069 # 06 Y:2016 | 06 | 2016 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,989 | $215 | Implemented |
IP0069 # 07 Y:2016 | 07 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $27,384 | $7,218 | Implemented |
IP0069 # 08 Y:2016 | 08 | 2016 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $22,750 | $12,163 | Not Implemented |
IP0069 # 09 Y:2016 | 09 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,712 | $1,271 | Not Implemented |
IP0069 # 10 Y:2016 | 10 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,756 | $4,316 | Implemented |
IP0069 # 11 Y:2016 | 11 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $231 | $351 | Implemented |
IP0069 # 12 Y:2016 | 12 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $15,955 | $38,395 | Not Implemented |
UM0466 # 05 Y:2016 | 05 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $387 | $400 | Implemented |
UM0466 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,085 | $21,450 | Not Implemented |
UM0466 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,784 | $1,000 | Implemented |
UM0466 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $1,801 | $1,000 | Implemented |
UM0466 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,747 | $2,000 | Not Implemented |
WV0510 # 11 Y:2015 | 11 | 2015 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,210 | $7,073 | Not Implemented |
WV0510 # 02 Y:2015 | 02 | 2015 | INSULATE BARE EQUIPMENT | $47,885 | $8,730 | Not Implemented |
WV0510 # 10 Y:2015 | 10 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,881 | $46 | Implemented |