IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
NAICS 33639 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0945 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,333 $300 Implemented
GT0945 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $39,291 $1,575 Implemented
UA0155 # 09 Y:2016 09 2016 USE PHOTOCELL CONTROLS $607 $582 Not Implemented
UA0155 # 01 Y:2016 01 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $61,044 $120 Not Implemented
UA0155 # 02 Y:2016 02 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $19,730 $50,000 Not Implemented
UA0155 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,633 $100 Implemented
UA0155 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,924 $2,995 Not Implemented
UA0155 # 05 Y:2016 05 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,574 $0 Implemented
UA0155 # 06 Y:2016 06 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,826 $2,520 Implemented
UA0155 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $7,261 $5,208 Not Implemented
UA0155 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,480 $15,842 Not Implemented
GT0890 # 05 Y:2012 05 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $12,607 $6,000 Not Implemented
GT0890 # 04 Y:2012 04 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,969 $0 Not Implemented
GT0890 # 03 Y:2012 03 2012 REDUCE VENTILATION AIR $36,009 $9,600 Not Implemented
GT0890 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,722 $19,250 Not Implemented
GT0890 # 01 Y:2012 01 2012 ADD AREA LIGHTING SWITCHES $1,457 $3,630 Not Implemented
GT0882 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,117 $155,150 Implemented
GT0882 # 08 Y:2011 08 2011 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $85,358 $222,000 Not Implemented
GT0882 # 07 Y:2011 07 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,800 $38,640 Implemented
GT0882 # 06 Y:2011 06 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $31,792 $136,000 Implemented
GT0882 # 05 Y:2011 05 2011 UPGRADE CONTROLS ON COMPRESSORS $16,076 $55,000 Implemented
GT0882 # 04 Y:2011 04 2011 METER WASTE WATER $3,614 $6,000 Not Implemented
GT0882 # 03 Y:2011 03 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $28,143 $70,000 Not Implemented
GT0882 # 02 Y:2011 02 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,201 $0 Not Implemented
GT0882 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,634 $0 Implemented