IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,252

matching recommendations
Reset
NAICS 33639 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0239 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,641 $9,144 Not Implemented
UA0239 # 07 Y:2021 07 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,822 $2,500 Not Implemented
UA0239 # 08 Y:2021 08 2021 USE RADIANT HEATER FOR SPOT HEATING $794 $709 Not Implemented
SU0502 # 01 Y:2021 01 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,573 $66 Not Implemented
SU0502 # 02 Y:2021 02 2021 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,847 $93 Implemented
SU0502 # 03 Y:2021 03 2021 REDUCE VENTILATION AIR $592 $499 Not Implemented
SU0502 # 04 Y:2021 04 2021 ELIMINATE/REDUCE AN OPERATION $1,845 $2,386 Not Implemented
SU0502 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $177 $244 Implemented
SU0502 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $275 $402 Implemented
UU0178 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,811 $1,300 Not Implemented
UU0178 # 02 Y:2021 02 2021 INSULATE BARE EQUIPMENT $8,654 $3,913 Not Implemented
UU0178 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $4,347 $9,400 Not Implemented
UU0178 # 04 Y:2021 04 2021 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $99,244 $320,000 Not Implemented
UU0178 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,197 $9,700 Not Implemented
UU0178 # 06 Y:2021 06 2021 Hire Energy Manager $25,000 $7,800 Not Implemented
UU0176 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $156,566 $187,200 Not Implemented
UU0176 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $94,747 $42,608 Implemented
UU0176 # 03 Y:2021 03 2021 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $29,753 $10,400 Implemented
UU0176 # 04 Y:2021 04 2021 OPTIMIZE PLANT POWER FACTOR $23,470 $21,270 Not Implemented
UU0176 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,766 $7,600 Implemented
UU0176 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,012 $22,700 Not Implemented
UU0176 # 07 Y:2021 07 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,411 $5,700 Implemented
MZ0292 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,645 $29,820 Implemented
MZ0292 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $460 $1,000 Implemented
MZ0292 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,098 $5,000 Implemented