Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2022 |
Principal Product | Fuel and Oil Filtration Products |
NAICS | 336390 - Other Motor Vehicle Parts Manufacturing |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $10,000,000-$50,000,000 |
# of Employees | 414 |
Plant Area (Sq.Ft.) | 338,958 |
Annual Production | 1,000,000 Units |
Production Hrs. Annual | 5,760 |
Location (State) | MS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $238,834 | 3,698,400 | kWh | $0.06 |
Electricity Demand | $97,853 | 6,792 | kW-months/year | $14.41 |
Natural Gas | $56,511 | 5,584 | MMBtu | $10.12 |
LPG | $3,151 | 95 | MMBtu | $33.17 |
TOTAL ENERGY COSTS | $401,769 | |||
RECOMMENDED SAVINGS* | $71,406 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $47,871 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | LPG | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | LPG | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $24,020 Cost: $107,478 |
$21,038 | 325,669 | $2,982 | 207 | - | - | - | - | - | - |
$21,038 325,669 kWh |
$2,982 207 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS |
Savings: $14,885 Cost: $400 |
$938 | 14,524 | - | - | $13,947 | 1,378 | - | - | - | - |
$938 14,524 kWh |
- - kW-months/year |
$13,947 1,378 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $12,152 Cost: $1,500 |
$8,781 | 135,929 | $3,371 | 234 | - | - | - | - | - | - |
$8,781 135,929 kWh |
$3,371 234 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $5,912 Cost: $18,000 |
$4,505 | 69,732 | $547 | 38 | $860 | 85 | - | - | - | - |
$4,505 69,732 kWh |
$547 38 kW-months/year |
$860 85 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $4,507 Cost: $150 |
$2,921 | 45,219 | $(-72) | (-5) | $1,658 | 164 | - | - | - | - |
$2,921 45,219 kWh |
$(-72) (-5) kW-months/year |
$1,658 164 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $4,143 Cost: - |
$4,143 | 62,128 | - | - | - | - | - | - | - | - |
$4,143 62,128 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $3,425 Cost: - |
$(-506) | (-7,833) | - | - | - | - | $3,151 | 95 | $780 | - |
$(-506) (-7,833) kWh |
- - kW-months/year |
- - MMBtu |
$3,151 95 MMBtu |
$780 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING |
Savings: $2,362 Cost: $2,736 |
$2,362 | 36,555 | - | - | - | - | - | - | - | - |
$2,362 36,555 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $71,406 Cost: $130,264 |
$44,182 | 681,923 | $6,828 | 474 | $16,465 | 1,627 | $3,151 | 95 | $780 | - | $44,182 681,923 kWh |
$6,828 474 kW-months/year |
$16,465 1,627 MMBtu |
$3,151 95 MMBtu |
$780 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $47,871 Cost: $129,714 |
$36,180 | 560,052 | $6,900 | 479 | $860 | 85 | $3,151 | 95 | $780 | - | $36,180 560,052 kWh |
$6,900 479 kW-months/year |
$860 85 MMBtu |
$3,151 95 MMBtu |
$780 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | LPG | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | LPG | Ancillary Material Cost |