IAC logo
IAC Assessment: TT0278
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0278
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2022
Principal Product Fuel and Oil Filtration Products
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 414
Plant Area (Sq.Ft.) 338,958
Annual Production 1,000,000 Units
Production Hrs. Annual 5,760
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $238,834 3,698,400 kWh $0.06
Electricity Demand $97,853 6,792 kW-months/year $14.41
Natural Gas $56,511 5,584 MMBtu $10.12
LPG $3,151 95 MMBtu $33.17
TOTAL ENERGY COSTS $401,769
RECOMMENDED SAVINGS* $71,406 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,871
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas LPG Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,020
Cost:
$107,478
$21,038 325,669 $2,982 207 - - - - - - $21,038
325,669
kWh
$2,982
207
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$14,885
Cost:
$400
$938 14,524 - - $13,947 1,378 - - - - $938
14,524
kWh
-
-
kW-months/year
$13,947
1,378
MMBtu
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,152
Cost:
$1,500
$8,781 135,929 $3,371 234 - - - - - - $8,781
135,929
kWh
$3,371
234
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$5,912
Cost:
$18,000
$4,505 69,732 $547 38 $860 85 - - - - $4,505
69,732
kWh
$547
38
kW-months/year
$860
85
MMBtu
-
-
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,507
Cost:
$150
$2,921 45,219 $(-72) (-5) $1,658 164 - - - - $2,921
45,219
kWh
$(-72)
(-5)
kW-months/year
$1,658
164
MMBtu
-
-
MMBtu
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,143
Cost:
-
$4,143 62,128 - - - - - - - - $4,143
62,128
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$3,425
Cost:
-
$(-506) (-7,833) - - - - $3,151 95 $780 - $(-506)
(-7,833)
kWh
-
-
kW-months/year
-
-
MMBtu
$3,151
95
MMBtu
$780
-
$
08: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$2,362
Cost:
$2,736
$2,362 36,555 - - - - - - - - $2,362
36,555
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$71,406
Cost:
$130,264
$44,182 681,923 $6,828 474 $16,465 1,627 $3,151 95 $780 - $44,182
681,923
kWh
$6,828
474
kW-months/year
$16,465
1,627
MMBtu
$3,151
95
MMBtu
$780
-
$
TOTAL IMPLEMENTED Savings:
$47,871
Cost:
$129,714
$36,180 560,052 $6,900 479 $860 85 $3,151 95 $780 - $36,180
560,052
kWh
$6,900
479
kW-months/year
$860
85
MMBtu
$3,151
95
MMBtu
$780
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas LPG Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas LPG Ancillary Material Cost