Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
87
matching recommendationsNAICS | 33639 | Other Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0187 # 04 Y:2017 | 04 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $33,082 | $14,405 | Not Implemented |
UA0187 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,219 | $6,260 | Implemented |
UA0187 # 01 Y:2017 | 01 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,441 | $1,892 | Not Implemented |
UA0187 # 06 Y:2017 | 06 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $88,008 | $0 | Implemented |
UA0187 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,032 | $136,663 | Implemented |
UA0187 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $67,895 | $250 | Not Implemented |
TR0006 # 06 Y:2017 | 06 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $117,470 | $11,908 | n/a |
TR0006 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,038 | $21,816 | n/a |
TR0006 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $271 | $279 | n/a |
TR0006 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $5,324 | $88 | n/a |
TR0006 # 07 Y:2017 | 07 | 2017 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $11,119 | $3,360 | n/a |
TR0006 # 04 Y:2017 | 04 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $31,644 | $0 | n/a |
TR0006 # 08 Y:2017 | 08 | 2017 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $23,655 | $0 | n/a |
TR0006 # 05 Y:2017 | 05 | 2017 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,005 | $208 | n/a |
UD0973 # 11 Y:2017 | 11 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,134 | $44,200 | Not Implemented |
UD0973 # 08 Y:2017 | 08 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,858 | $0 | Not Implemented |
UD0973 # 07 Y:2017 | 07 | 2017 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $58,900 | $97,666 | Not Implemented |
UD0973 # 06 Y:2017 | 06 | 2017 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $2,445 | $0 | Not Implemented |
UD0973 # 05 Y:2017 | 05 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $18,317 | $40 | Not Implemented |
UD0973 # 04 Y:2017 | 04 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $23,858 | $8,000 | Not Implemented |
UD0973 # 10 Y:2017 | 10 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,232 | $10,000 | Not Implemented |
UD0973 # 09 Y:2017 | 09 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,323 | $3,821 | Not Implemented |
UD0973 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,320 | $1,000 | Not Implemented |
UD0973 # 02 Y:2017 | 02 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $73,029 | $100,000 | Not Implemented |
UD0973 # 01 Y:2017 | 01 | 2017 | METER WASTE WATER | $6,762 | $1,000 | Not Implemented |