Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
NAICS 336390 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0204 # 03 Y:2024 03 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $9,349 $2,500 n/a
IP0204 # 02 Y:2024 02 2024 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $83,128 $16,790 n/a
IP0204 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $114,962 $0 n/a
IP0204 # 04 Y:2024 04 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $31,597 $20,000 n/a
IP0204 # 05 Y:2024 05 2024 RECOVER WASTE HEAT FROM EQUIPMENT $8,853 $5,575 n/a
IP0204 # 07 Y:2024 07 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,338 $1,855 n/a
IP0204 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $6,381 $4,247 n/a
IP0204 # 08 Y:2024 08 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,526 $3,257 n/a
IP0195 # 03 Y:2024 03 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,465 $0 Not Implemented
IP0195 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $473 $628 Not Implemented
IP0195 # 08 Y:2024 08 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $37,878 $224,750 Not Implemented
IP0195 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $2,446 $10,400 Not Implemented
IP0195 # 06 Y:2024 06 2024 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $97,675 $217,296 Not Implemented
IP0195 # 04 Y:2024 04 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,660 $1,592 Not Implemented
IP0195 # 02 Y:2024 02 2024 USE OPTIMUM TEMPERATURE $9,989 $0 Not Implemented
IP0195 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,407 $750 Not Implemented
IP0191 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $18,779 $0 Not Implemented
IP0191 # 05 Y:2024 05 2024 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $1,226 $984 Not Implemented
IP0191 # 07 Y:2024 07 2024 RECOVER WASTE HEAT FROM EQUIPMENT $5,739 $13,340 Not Implemented
IP0191 # 08 Y:2024 08 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $428 $1,099 Not Implemented
IP0191 # 06 Y:2024 06 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $87,660 $91,077 Not Implemented
IP0191 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $27,225 $8,610 Not Implemented
IP0191 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,730 $735 Not Implemented
IP0191 # 02 Y:2024 02 2024 USE OPTIMUM TEMPERATURE $4,978 $384 Not Implemented
IP0171 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $117 $499 Not Implemented