Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

222

matching recommendations
Reset
NAICS 3364 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1088 # 10 Y:2023 10 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,923 $16,543 Not Implemented
OK1088 # 09 Y:2023 09 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,600 $14,300 Not Implemented
OK1088 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,914 $0 Not Implemented
OK1088 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,555 $1,225 Not Implemented
OK1088 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $3,911 $3,927 Not Implemented
OK1088 # 02 Y:2023 02 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $19,066 $0 Not Implemented
OK1088 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,898 $25,297 Not Implemented
OK1088 # 07 Y:2023 07 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,964 $446 Not Implemented
OK1088 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,763 $3,150 Not Implemented
OK1045 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,363 $528 Implemented
OK1045 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,188 $2,563 Implemented
OK1045 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $527 $0 Implemented
OK1045 # 06 Y:2021 06 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $1,380 $0 Implemented
OK1045 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,011 $14,146 Implemented
OK1045 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,356 $512 Not Implemented
OK1045 # 08 Y:2021 08 2021 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $140 $110 Implemented
OK1045 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $3,431 $0 Implemented
OK1031 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,011 $1,186 Implemented
OK1031 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,734 $0 Implemented
OK1031 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,053 $4,865 Not Implemented
OK1031 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,935 $21,052 Implemented
OK1031 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,590 $745 Implemented
OK1031 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,015 $8,099 Not Implemented
OK1026 # 07 Y:2020 07 2020 RECOVER WASTE HEAT FROM EQUIPMENT $4,974 $0 Implemented
OK1026 # 08 Y:2020 08 2020 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,239 $795 Implemented