IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,719

matching recommendations
Reset
NAICS 3364 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0493 # 01 Y:2020 01 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,226 $0 Not Implemented
LE0493 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,392 $40 Not Implemented
LE0493 # 03 Y:2020 03 2020 INSTALL TIMERS AND/OR THERMOSTATS $1,943 $120 Not Implemented
LE0493 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,484 $4,000 Not Implemented
LE0493 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,371 $3,160 Not Implemented
LE0493 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,494 $9,550 Not Implemented
LE0493 # 07 Y:2020 07 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,282 $10,500 Not Implemented
LE0493 # 08 Y:2020 08 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,861 $42,000 Not Implemented
MI0367 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $38,331 $2,480 Implemented
MI0367 # 02 Y:2020 02 2020 USE BATTERY STORAGE FOR DEMAND CONTROL $21,335 $38,237 Not Implemented
MI0367 # 03 Y:2020 03 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $18,517 $2,480 Implemented
MI0367 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,815 $120 Implemented
MI0367 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,479 $9,842 Implemented
MI0367 # 06 Y:2020 06 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,241 $4,900 Not Implemented
MI0367 # 07 Y:2020 07 2020 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,190 $2,500 Not Implemented
MI0367 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,348 $1,980 Not Implemented
AS0476 # 01 Y:2019 01 2019 INSTALL WIND POWERED ELECTRIC GENERATOR $924,031 $7,925,140 Not Implemented
AS0476 # 02 Y:2019 02 2019 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $379,615 $78,024 Not Implemented
AS0476 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $65,373 $17,381 Not Implemented
AS0476 # 04 Y:2019 04 2019 RECOVER AND REUSE COOLING WATER $14,698 $7,484 Not Implemented
LS1908 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,210 $0 Implemented
LS1908 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $64,386 $25,000 Implemented
LS1908 # 03 Y:2019 03 2019 INSTALL SKYLIGHTS $22,426 $12,600 Not Implemented
LS1908 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,396 $21,120 Implemented
LS1908 # 05 Y:2019 05 2019 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $46,800 $30,000 Implemented