Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
96
matching recommendationsNAICS | 33641 | Aerospace Product and Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0020 # 06 Y:2024 | 06 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $52,462 | $0 | Implemented |
NT0020 # 07 Y:2024 | 07 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $113,865 | $96,040 | Not Implemented |
NT0020 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,816 | $16,551 | Not Implemented |
NT0020 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $3,147 | $11,909 | Not Implemented |
NT0020 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,277 | $33,920 | Not Implemented |
NT0020 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,251 | $0 | Implemented |
NT0020 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,491 | $4,553 | Implemented |
TR0043 # 01 Y:2022 | 01 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $33,031 | $5,000 | Implemented |
TR0043 # 03 Y:2022 | 03 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,725 | $389 | Not Implemented |
TR0043 # 02 Y:2022 | 02 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $34,391 | $20,500 | Not Implemented |
NT0010 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,307 | $5,753 | Not Implemented |
NT0010 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,261 | $0 | Not Implemented |
NT0010 # 03 Y:2023 | 03 | 2023 | OPTIMIZE PLANT POWER FACTOR | $4,823 | $5,241 | Not Implemented |
NT0010 # 04 Y:2023 | 04 | 2023 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $37,440 | $111,000 | Not Implemented |
NT0010 # 05 Y:2023 | 05 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,400 | $1,600 | Not Implemented |
NT0010 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,423 | $0 | Not Implemented |
NT0001 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,144 | $5,801 | Implemented |
NT0001 # 02 Y:2023 | 02 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $16,452 | $9,984 | Implemented |
NT0001 # 03 Y:2023 | 03 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,130 | $1,258 | Implemented |
NT0001 # 04 Y:2023 | 04 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,448 | $9,020 | Not Implemented |
NT0001 # 05 Y:2023 | 05 | 2023 | INSTALL SET-BACK TIMERS | $883 | $0 | Implemented |
NT0001 # 06 Y:2023 | 06 | 2023 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $2,710 | $0 | Implemented |
NT0001 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,707 | $6,472 | Implemented |
AM0830 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,150 | $0 | Implemented |
AM0830 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $4,020 | $16,040 | Not Implemented |