Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
379
matching recommendationsNAICS | 336412 | Aircraft Engine and Engine Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1053 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $11,834 | $16,500 | Not Implemented |
OK1043 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,397 | $2,946 | Implemented |
OK1043 # 05 Y:2021 | 05 | 2021 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $2,008 | $952 | Not Implemented |
OK1043 # 03 Y:2021 | 03 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,309 | $35,400 | Implemented |
OK1043 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $331 | $1,650 | Implemented |
OK1043 # 01 Y:2021 | 01 | 2021 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,091 | $8,000 | Implemented |
MI0382 # 04 Y:2020 | 04 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,045 | $1,796 | Not Implemented |
MI0382 # 01 Y:2020 | 01 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,223 | $3,645 | Not Implemented |
MI0382 # 07 Y:2020 | 07 | 2020 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $964 | $1,884 | Implemented |
MI0382 # 02 Y:2020 | 02 | 2020 | USE SOLAR HEAT TO HEAT WATER | $7,209 | $8,409 | Not Implemented |
MI0382 # 03 Y:2020 | 03 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $5,430 | $2,740 | Not Implemented |
MI0382 # 06 Y:2020 | 06 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,088 | $1,306 | Not Implemented |
MI0382 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,278 | $3,204 | Implemented |
MI0381 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,688 | $4,905 | Implemented |
MI0381 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,735 | $980 | Implemented |
MI0381 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,914 | $860 | Implemented |
MI0381 # 03 Y:2020 | 03 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,145 | $2,400 | Not Implemented |
MI0381 # 06 Y:2020 | 06 | 2020 | KEEP BOILER TUBES CLEAN | $2,320 | $3,500 | Not Implemented |
MI0381 # 01 Y:2020 | 01 | 2020 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $23,304 | $57,960 | Not Implemented |
MI0381 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,241 | $555 | Implemented |
IP0142 # 09 Y:2020 | 09 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $25 | $40 | Not Implemented |
IP0142 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $94 | $40 | Implemented |
IP0142 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $146 | $100 | Not Implemented |
IP0142 # 01 Y:2020 | 01 | 2020 | PAY BILLS ON TIME TO AVOID LATE FEES | $580 | $0 | Not Implemented |
IP0142 # 02 Y:2020 | 02 | 2020 | COMBINE UTILITY METERS | $494 | $0 | Implemented |