IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,062

matching recommendations
Reset
NAICS 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1102 # 08 Y:2025 08 2025 OPTIMIZE PLANT POWER FACTOR $9,007 $30,514 n/a
UD1102 # 05 Y:2025 05 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,572 $16,800 n/a
UD1102 # 09 Y:2025 09 2025 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,671 $0 n/a
UD1102 # 07 Y:2025 07 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $326,496 $385,000 n/a
UD1102 # 04 Y:2025 04 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $61,605 $8,161 n/a
UD1102 # 01 Y:2025 01 2025 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $52,334 $0 n/a
UD1102 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,527 $900 n/a
UD1102 # 10 Y:2025 10 2025 INSTALL OCCUPANCY SENSORS $148 $449 n/a
UD1102 # 03 Y:2025 03 2025 RECOVER WASTE HEAT FROM EQUIPMENT $798 $1,000 n/a
GT0981 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $634,339 $8,779,600 Not Implemented
GT0981 # 02 Y:2024 02 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,928 $1,050 Not Implemented
GT0981 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,995 $1,850 Not Implemented
GT0981 # 07 Y:2024 07 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,239 $9,917 Not Implemented
GT0981 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,966 $1,875 Not Implemented
GT0981 # 05 Y:2024 05 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $4,154 $2,205 Not Implemented
GT0981 # 01 Y:2024 01 2024 PAY UTILITY BILLS ON TIME $8,976 $200 Implemented
GT0981 # 08 Y:2024 08 2024 OPTIMIZE PLANT POWER FACTOR $3,926 $17,994 Not Implemented
GT0981 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $935 $461 Not Implemented
OK1122 # 07 Y:2024 07 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $534 $403 Implemented
OK1122 # 02 Y:2024 02 2024 OPTIMIZE PLANT POWER FACTOR $1,369 $1,999 Not Implemented
OK1122 # 05 Y:2024 05 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,883 $5,538 Not Implemented
OK1122 # 09 Y:2024 09 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,790 $3,368 Not Implemented
OK1122 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,929 $600 Implemented
OK1122 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,248 $6,134 Implemented
OK1122 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,216 $0 Implemented