Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,028
matching recommendationsNAICS | 336413 | Other Aircraft Parts and Auxiliary Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0047 # 02 Y:2010 | 02 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,044 | $0 | Not Implemented |
DL0047 # 03 Y:2010 | 03 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,212 | $0 | Implemented |
DL0047 # 04 Y:2010 | 04 | 2010 | DISCONNECT BALLASTS | $1,481 | $0 | Not Implemented |
DL0047 # 05 Y:2010 | 05 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,068 | $0 | Implemented |
DL0047 # 06 Y:2010 | 06 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,117 | $690 | Not Implemented |
DL0047 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $30,000 | $6,000 | Implemented |
DL0047 # 08 Y:2010 | 08 | 2010 | INSTALL OCCUPANCY SENSORS | $3,491 | $1,573 | Implemented |
DL0047 # 09 Y:2010 | 09 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,972 | $3,840 | Not Implemented |
DL0047 # 10 Y:2010 | 10 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,288 | $24,000 | Not Implemented |
DL0047 # 11 Y:2010 | 11 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $750 | $2,800 | Implemented |
DL0047 # 12 Y:2010 | 12 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,966 | $77,940 | Not Implemented |
UF0430 # 01 Y:2010 | 01 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $28,959 | $5,655 | Implemented |
UF0430 # 02 Y:2010 | 02 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,044 | $0 | Implemented |
UF0430 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,531 | $0 | Not Implemented |
UF0430 # 04 Y:2010 | 04 | 2010 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,547 | $0 | Implemented |
UF0430 # 05 Y:2010 | 05 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,211 | $0 | Not Implemented |
UF0430 # 06 Y:2010 | 06 | 2010 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $86,549 | $4,000 | Not Implemented |
UF0430 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,016 | $404 | Implemented |
UF0430 # 08 Y:2010 | 08 | 2010 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $6,842 | $0 | Implemented |
MA0656 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,238 | $900 | Implemented |
MA0656 # 02 Y:2010 | 02 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,273 | $19,075 | Not Implemented |
MA0656 # 03 Y:2010 | 03 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,578 | $2,400 | Not Implemented |
MA0656 # 04 Y:2010 | 04 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,891 | $15,755 | Not Implemented |
MA0656 # 05 Y:2010 | 05 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,718 | $3,915 | Implemented |
MA0656 # 06 Y:2010 | 06 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $36,936 | $68,200 | Implemented |