IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 3365 Railroad Rolling Stock Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0550 # 02 Y:2004 02 2004 DISTILL CONTAMINATED SOLVENTS FOR REUSE $1,720 $6,070 Not Implemented
CO0550 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,960 $2,000 Implemented
CO0550 # 11 Y:2004 11 2004 PAY BILLS ON TIME TO AVOID LATE FEES $390 $0 Implemented
CO0550 # 10 Y:2004 10 2004 ADD AREA LIGHTING SWITCHES $2,070 $4,850 Implemented
CO0550 # 09 Y:2004 09 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,210 $17,000 Not Implemented
CO0550 # 08 Y:2004 08 2004 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,570 $1,000 Implemented
CO0550 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,040 $77,000 Not Implemented
CO0550 # 06 Y:2004 06 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,160 $23,870 Not Implemented
CO0550 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $490 $0 Not Implemented
CO0550 # 04 Y:2004 04 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $590 $3,520 Implemented
CO0550 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,000 $180 Implemented
IC0080 # 14 Y:2004 14 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $258 $0 Implemented
IC0080 # 13 Y:2004 13 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $232 $49 Implemented
IC0080 # 12 Y:2004 12 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $787 $896 Implemented
IC0080 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $413 $1,540 Implemented
IC0080 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,008 $11,878 Not Implemented
IC0080 # 09 Y:2004 09 2004 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $1,154 $10,967 Not Implemented
IC0080 # 08 Y:2004 08 2004 INSTALL TIMERS AND/OR THERMOSTATS $377 $1,384 Not Implemented
IC0080 # 07 Y:2004 07 2004 USE OPTIMUM TEMPERATURE $62,610 $35,948 Implemented
IC0080 # 06 Y:2004 06 2004 USE OPTIMUM TEMPERATURE $24,757 $53,496 Not Implemented
IC0080 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,354 $2,640 Implemented
IC0080 # 04 Y:2004 04 2004 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $40,931 $95,360 Implemented
IC0080 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,046 $0 Implemented
IC0080 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,280 $10,420 Implemented
IC0080 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,301 $900 Implemented