Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 33651 | Railroad Rolling Stock Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0550 # 02 Y:2004 | 02 | 2004 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $1,720 | $6,070 | Not Implemented |
CO0550 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,960 | $2,000 | Implemented |
CO0550 # 11 Y:2004 | 11 | 2004 | PAY BILLS ON TIME TO AVOID LATE FEES | $390 | $0 | Implemented |
CO0550 # 10 Y:2004 | 10 | 2004 | ADD AREA LIGHTING SWITCHES | $2,070 | $4,850 | Implemented |
CO0550 # 09 Y:2004 | 09 | 2004 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,210 | $17,000 | Not Implemented |
CO0550 # 08 Y:2004 | 08 | 2004 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,570 | $1,000 | Implemented |
CO0550 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,040 | $77,000 | Not Implemented |
CO0550 # 06 Y:2004 | 06 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,160 | $23,870 | Not Implemented |
CO0550 # 05 Y:2004 | 05 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $490 | $0 | Not Implemented |
CO0550 # 04 Y:2004 | 04 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $590 | $3,520 | Implemented |
CO0550 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,000 | $180 | Implemented |
IC0080 # 14 Y:2004 | 14 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $258 | $0 | Implemented |
IC0080 # 13 Y:2004 | 13 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $232 | $49 | Implemented |
IC0080 # 12 Y:2004 | 12 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $787 | $896 | Implemented |
IC0080 # 11 Y:2004 | 11 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $413 | $1,540 | Implemented |
IC0080 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,008 | $11,878 | Not Implemented |
IC0080 # 09 Y:2004 | 09 | 2004 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $1,154 | $10,967 | Not Implemented |
IC0080 # 08 Y:2004 | 08 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $377 | $1,384 | Not Implemented |
IC0080 # 07 Y:2004 | 07 | 2004 | USE OPTIMUM TEMPERATURE | $62,610 | $35,948 | Implemented |
IC0080 # 06 Y:2004 | 06 | 2004 | USE OPTIMUM TEMPERATURE | $24,757 | $53,496 | Not Implemented |
IC0080 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,354 | $2,640 | Implemented |
IC0080 # 04 Y:2004 | 04 | 2004 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $40,931 | $95,360 | Implemented |
IC0080 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,046 | $0 | Implemented |
IC0080 # 02 Y:2004 | 02 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,280 | $10,420 | Implemented |
IC0080 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,301 | $900 | Implemented |