IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164

matching recommendations
Reset
NAICS 3369 Other Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0089 # 05 Y:2012 05 2012 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $124,000 $150,000 Not Implemented
NC0472 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,563 $16,950 Implemented
NC0472 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $845 $1,125 Not Implemented
NC0472 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84 $200 Not Implemented
NC0472 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $188 $50 Implemented
NC0472 # 05 Y:2012 05 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24 $0 Implemented
UM0375 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126,231 $236,764 Implemented
UM0375 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,709 $4,000 Implemented
UM0375 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $7,646 $4,232 Implemented
UM0375 # 04 Y:2010 04 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $27,796 $140,490 Implemented
UM0375 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $16,802 $5,500 Implemented
UA0041 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55,100 $119,700 Implemented
UA0041 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $2,630 $380 Not Implemented
UA0041 # 03 Y:2010 03 2010 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $5,320 $2,520 Implemented
UA0041 # 04 Y:2010 04 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $216,130 $0 Implemented
UA0041 # 05 Y:2010 05 2010 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $76,495 $0 Implemented
UA0041 # 06 Y:2010 06 2010 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $21,020 $19,015 Not Implemented
UA0041 # 07 Y:2010 07 2010 INSULATE BARE EQUIPMENT $1,020 $2,450 Implemented
UA0041 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,050 $2 Implemented
UA0041 # 09 Y:2010 09 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,310 $22,000 Not Implemented
UA0041 # 10 Y:2010 10 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,050 $7 Not Implemented
UA0041 # 11 Y:2010 11 2010 INSTALL TIMERS AND/OR THERMOSTATS $5,765 $675 Implemented
SD0392 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,246 $20,870 Not Implemented
SD0392 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,991 $7,991 Not Implemented
SD0392 # 03 Y:2007 03 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,417 $17,500 Not Implemented