Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Indiana University-Purdue University |
---|---|
Assessment Year | 2013 |
Principal Product | Motorcycle Exhaust Pipes |
NAICS | 336991 - Motorcycle, Bicycle, and Parts Manufacturing |
SIC | 3751 - Motorcycles, Bicycles, And Parts |
Sales | $5,000,000-$10,000,000 |
# of Employees | 107 |
Plant Area (Sq.Ft.) | 66,000 |
Annual Production | 20,200 Pieces |
Production Hrs. Annual | 1,960 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $50,629 | 814,500 | kWh | $0.06 |
Electricity Demand | $40,474 | 3,901 | kW-months/year | $10.38 |
Electricity Fees | $11,521 | - | $ | - |
Natural Gas | $6,954 | 892 | MMBtu | $7.80 |
TOTAL ENERGY COSTS | $109,578 | |||
RECOMMENDED SAVINGS* | $34,354 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,638 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $2,083 Cost: - |
- | - | - | - | $2,083 | 267 | - | - |
- - kWh |
- - kW-months/year |
$2,083 267 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $421 Cost: - |
$421 | 6,546 | - | - | - | - | - | - |
$421 6,546 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $197 Cost: - |
$98 | 1,529 | $99 | 9 | - | - | - | - |
$98 1,529 kWh |
$99 9 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS |
Savings: $7,284 Cost: $1,400 |
- | - | - | - | - | - | $7,284 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$7,284 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS |
Savings: $3,008 Cost: $797 |
$1,828 | 28,436 | $1,180 | 112 | - | - | - | - |
$1,828 28,436 kWh |
$1,180 112 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $19,081 Cost: $21,876 |
$9,135 | 142,071 | $9,946 | 941 | - | - | - | - |
$9,135 142,071 kWh |
$9,946 941 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $708 Cost: $1,622 |
$353 | 5,488 | $355 | 34 | - | - | - | - |
$353 5,488 kWh |
$355 34 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,271 Cost: $1,400 |
$1,271 | 19,766 | - | - | - | - | - | - |
$1,271 19,766 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $301 Cost: $490 |
$301 | 4,677 | - | - | - | - | - | - |
$301 4,677 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $34,354 Cost: $27,585 |
$13,407 | 208,513 | $11,580 | 1,096 | $2,083 | 267 | $7,284 | - | $13,407 208,513 kWh |
$11,580 1,096 kW-months/year |
$2,083 267 MMBtu |
$7,284 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,638 Cost: $2,800 |
$1,271 | 19,766 | - | - | $2,083 | 267 | $7,284 | - | $1,271 19,766 kWh |
- - kW-months/year |
$2,083 267 MMBtu |
$7,284 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Primary Raw Material |