IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
NAICS 3369 Other Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0392 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,970 $0 Not Implemented
SD0392 # 03 Y:2007 03 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,417 $17,500 Not Implemented
SD0392 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,991 $7,991 Not Implemented
SD0392 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,246 $20,870 Not Implemented
LM0060 # 10 Y:2003 10 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,416 $14,328 Implemented
LM0060 # 15 Y:2003 15 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $112,500 $8,120 Implemented
LM0060 # 14 Y:2003 14 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $37,800 $20,000 Implemented
LM0060 # 13 Y:2003 13 2003 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,200 $75 Not Implemented
LM0060 # 12 Y:2003 12 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,651 $11,000 Not Implemented
LM0060 # 11 Y:2003 11 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,936 $2,088 Implemented
LM0060 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $37,718 $300 Not Implemented
LM0060 # 09 Y:2003 09 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,049 $100 Implemented
LM0060 # 08 Y:2003 08 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $8,917 $1,000 Not Implemented
LM0060 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,819 $12,615 Not Implemented
LM0060 # 06 Y:2003 06 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $1,881 $0 Not Implemented
LM0060 # 05 Y:2003 05 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,820 $650 Implemented
LM0060 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,131 $100 Implemented
LM0060 # 03 Y:2003 03 2003 COVER OPEN TANKS $1,410 $175 Not Implemented
LM0060 # 02 Y:2003 02 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,782 $12,000 Not Implemented