Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Loyola Marymount University |
---|---|
Assessment Year | 2003 |
Principal Product | Motorcycle Parts |
NAICS | 336991 - Motorcycle, Bicycle, and Parts Manufacturing |
SIC | 3751 - Motorcycles, Bicycles, And Parts |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 95,000 |
Annual Production | 700,000 Pieces |
Production Hrs. Annual | 5,304 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $332,769 | 2,826,969 | kWh | $0.12 |
Electricity Demand | $125,480 | 9,252 | kW-months/year | $13.56 |
Electricity Fees | $34,272 | - | $ | - |
Natural Gas | $59,672 | 12,081 | MMBtu | $4.94 |
TOTAL ENERGY COSTS | $552,193 | |||
RECOMMENDED SAVINGS* | $254,030 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $179,652 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $37,718 Cost: $300 |
- | - | - | - | - | - | - | - | $(-34,650) | - | $72,368 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$(-34,650) - $ |
$72,368 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $7,782 Cost: $12,000 |
$5,559 | 34,000 | $2,223 | 235 | - | - | - | - | - | - | - | - |
$5,559 34,000 kWh |
$2,223 235 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2514 COVER OPEN TANKS |
Savings: $1,410 Cost: $175 |
- | - | - | - | $1,410 | 328 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,410 328 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,131 Cost: $100 |
$3,109 | 24,930 | $802 | 56 | - | - | - | - | $(-780) | - | - | - |
$3,109 24,930 kWh |
$802 56 kW-months/year |
- - MMBtu |
- - lb |
$(-780) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $12,820 Cost: $650 |
$10,192 | 81,726 | $2,628 | 185 | - | - | - | - | - | - | - | - |
$10,192 81,726 kWh |
$2,628 185 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $1,881 Cost: - |
$1,612 | 11,138 | $269 | 25 | - | - | - | - | - | - | - | - |
$1,612 11,138 kWh |
$269 25 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,819 Cost: $12,615 |
$6,216 | 49,836 | $1,603 | 113 | - | - | - | - | - | - | - | - |
$6,216 49,836 kWh |
$1,603 113 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $8,917 Cost: $1,000 |
$7,089 | 56,837 | $1,828 | 128 | - | - | - | - | - | - | - | - |
$7,089 56,837 kWh |
$1,828 128 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $1,049 Cost: $100 |
$834 | 6,683 | $215 | 16 | - | - | - | - | - | - | - | - |
$834 6,683 kWh |
$215 16 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $8,416 Cost: $14,328 |
$6,691 | 53,650 | $1,725 | 121 | - | - | - | - | - | - | - | - |
$6,691 53,650 kWh |
$1,725 121 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $3,936 Cost: $2,088 |
$3,120 | 24,960 | $816 | 56 | - | - | - | - | - | - | - | - |
$3,120 24,960 kWh |
$816 56 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $7,651 Cost: $11,000 |
- | - | - | - | - | - | $8,926 | - | $(-1,275) | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$8,926 - lb |
$(-1,275) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $1,200 Cost: $75 |
- | - | - | - | - | - | - | - | - | - | $1,200 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$1,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $37,800 Cost: $20,000 |
- | - | - | - | - | - | - | - | - | - | $37,800 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$37,800 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $112,500 Cost: $8,120 |
- | - | - | - | - | - | - | - | - | - | $112,500 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$112,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $254,030 Cost: $82,551 |
$44,422 | 343,760 | $12,109 | 935 | $1,410 | 328 | $8,926 | - | $(-36,705) | - | $223,868 | - | $44,422 343,760 kWh |
$12,109 935 kW-months/year |
$1,410 328 MMBtu |
$8,926 - lb |
$(-36,705) - $ |
$223,868 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $179,652 Cost: $45,386 |
$23,946 | 191,949 | $6,186 | 434 | - | - | - | - | $(-780) | - | $150,300 | - | $23,946 191,949 kWh |
$6,186 434 kW-months/year |
- - MMBtu |
- - lb |
$(-780) - $ |
$150,300 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes |