IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
NAICS 336999 All Other Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0263 # 01 Y:2021 01 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $45,807 $72,000 Not Implemented
TT0263 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,663 $88,815 Implemented
TT0263 # 05 Y:2021 05 2021 RECOVER WASTE HEAT FROM EQUIPMENT $4,140 $5,000 Not Implemented
TT0263 # 04 Y:2021 04 2021 ADOPT IN-HOUSE MATERIAL GENERATION $9,686 $17,700 Not Implemented
TT0263 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,566 $6,725 Not Implemented
NC0622 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,812 $46,617 Implemented
NC0622 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $481 $250 Implemented
NC0622 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,414 $525 Implemented
NC0622 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $161 $450 Not Implemented
NC0622 # 05 Y:2018 05 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,361 $6,000 Not Implemented
NC0622 # 06 Y:2018 06 2018 RECOVER WASTE HEAT FROM EQUIPMENT $4,913 $8,000 Not Implemented
NC0622 # 07 Y:2018 07 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,221 $1,000 Not Implemented
NC0622 # 08 Y:2018 08 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,727 $28,500 Not Implemented
NC0622 # 09 Y:2018 09 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,903 $500 Implemented
BS0113 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,656 $2,640 Not Implemented
BS0113 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,211 $360 Not Implemented
BS0113 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $193 Not Implemented
BS0113 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,622 $100 Not Implemented
TT0106 # 04 Y:2013 04 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $2,586 $9,280 Not Implemented
TT0106 # 03 Y:2013 03 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $1,763 $5,520 Not Implemented
TT0106 # 02 Y:2013 02 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,063 $720 Implemented
TT0106 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $8,613 $37,637 Not Implemented
OK0843 # 08 Y:2013 08 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,735 $3,900 Not Implemented
OK0843 # 13 Y:2013 13 2013 OPTIMIZE PLANT POWER FACTOR $3,539 $11,638 Not Implemented
OK0843 # 12 Y:2013 12 2013 INSULATE BARE EQUIPMENT $263 $768 Not Implemented