IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,673

matching recommendations
Reset
NAICS 337 Furniture and Related Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0181 # 05 Y:2017 05 2017 INSTALL TIMERS AND/OR THERMOSTATS $3,255 $1,850 Implemented
UA0181 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,890 $987 Not Implemented
UK1701 # 01 Y:2017 01 2017 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $10,415 $8,440 Not Implemented
UK1701 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,847 $4,000 Not Implemented
UK1701 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,878 $11,800 Not Implemented
UK1701 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $257 $384 Not Implemented
UK1701 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,902 $10,000 Not Implemented
UK1701 # 06 Y:2017 06 2017 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $1,690 $2,875 Not Implemented
UK1701 # 07 Y:2017 07 2017 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $3,158 $393 Not Implemented
UK1701 # 08 Y:2017 08 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,875 $1,500 Not Implemented
UK1701 # 09 Y:2017 09 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,426 $1,350 Not Implemented
UK1701 # 10 Y:2017 10 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,915 $0 Not Implemented
UK1701 # 11 Y:2017 11 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,452 $2,100 Not Implemented
UK1701 # 12 Y:2017 12 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,682 $5,300 Not Implemented
UK1701 # 13 Y:2017 13 2017 USE PHOTOCELL CONTROLS $1,070 $800 Not Implemented
UM0486 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,932 $3,000 n/a
UM0486 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $896 $2,400 n/a
UM0486 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,120 $18,000 n/a
UM0486 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $342 $1,500 n/a
SD0546 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,392 $25,659 Implemented
SD0546 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $8,753 $17,253 Implemented
SD0546 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,431 $6,068 Implemented
SD0546 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,299 $2,500 Implemented
SD0546 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $989 $400 Implemented
SD0546 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $419 $1,000 Implemented