Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsNAICS | 3371 | Household and Institutional Furniture and Kitchen Cabinet Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0926 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $190,860 | $18,580 | n/a |
AM0926 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $22,740 | $22,490 | n/a |
AM0926 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,460 | $33 | n/a |
AM0926 # 04 Y:2024 | 04 | 2024 | USE PHOTOCELL CONTROLS | $410 | $60 | n/a |
AM0926 # 05 Y:2024 | 05 | 2024 | USE SYNTHETIC LUBRICANT | $410 | $10 | n/a |
AM0926 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $190 | $250 | n/a |
WV0665 # 10 Y:2024 | 10 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,835 | $150 | n/a |
WV0665 # 09 Y:2024 | 09 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $2,096 | $1,417 | n/a |
WV0665 # 08 Y:2024 | 08 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,306 | $1,070 | n/a |
WV0665 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $3,763 | $2,971 | n/a |
WV0665 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,064 | $3,296 | n/a |
WV0665 # 05 Y:2024 | 05 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $6,272 | $1,500 | n/a |
WV0665 # 04 Y:2024 | 04 | 2024 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $7,315 | $22,800 | n/a |
WV0665 # 03 Y:2024 | 03 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $7,375 | $13,475 | n/a |
WV0665 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $61,926 | $238,677 | n/a |
WV0665 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $100,715 | $390,000 | n/a |
WV0665 # 11 Y:2024 | 11 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,829 | $9,140 | n/a |
WV0665 # 12 Y:2024 | 12 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,582 | $375 | n/a |
LE0568 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,155 | $1,400 | n/a |
LE0568 # 01 Y:2024 | 01 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,304 | $0 | n/a |
LE0568 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,295 | $12,500 | n/a |
LE0568 # 09 Y:2024 | 09 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,779 | $78,580 | n/a |
LE0568 # 03 Y:2024 | 03 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $6,769 | $1,120 | n/a |
LE0568 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $1,730 | $1,215 | n/a |
LE0568 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $684 | $950 | n/a |