Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
719
matching recommendationsNAICS | 33712 | Household and Institutional Furniture Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0568 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,295 | $12,500 | n/a |
LE0568 # 08 Y:2024 | 08 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,570 | $9,661 | n/a |
LE0568 # 09 Y:2024 | 09 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,779 | $78,580 | n/a |
LE0568 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $684 | $950 | n/a |
LE0568 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,155 | $1,400 | n/a |
LE0568 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $1,730 | $1,215 | n/a |
LE0568 # 03 Y:2024 | 03 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $6,769 | $1,120 | n/a |
LE0568 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,890 | $200 | n/a |
LE0568 # 01 Y:2024 | 01 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,304 | $0 | n/a |
LE0547 # 02 Y:2023 | 02 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,446 | $1,500 | Not Implemented |
LE0547 # 01 Y:2023 | 01 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $846 | $400 | Implemented |
LE0547 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $602 | $1,720 | Implemented |
LE0547 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,448 | $13,930 | Implemented |
LE0547 # 05 Y:2023 | 05 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $6,147 | $30,000 | Not Implemented |
OK1086 # 03 Y:2023 | 03 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $8,472 | $13,560 | Not Implemented |
OK1086 # 02 Y:2023 | 02 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $630 | $330 | Implemented |
OK1086 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,948 | $382,200 | Not Implemented |
OK1086 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,012 | $1,489 | Implemented |
UU0212 # 02 Y:2023 | 02 | 2023 | REPLACE BOILER | $11,580 | $80,000 | Not Implemented |
UU0212 # 05 Y:2023 | 05 | 2023 | USE OPTIMUM THICKNESS INSULATION | $4,220 | $4,402 | Not Implemented |
UU0212 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $4,400 | $9,000 | Not Implemented |
UU0212 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $382 | $1,370 | Not Implemented |
UU0212 # 06 Y:2023 | 06 | 2023 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $425 | $850 | Not Implemented |
UU0212 # 01 Y:2023 | 01 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,149 | $8,500 | Not Implemented |
UU0212 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,326 | $21,555 | Not Implemented |