IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

736

matching recommendations
Reset
NAICS 33712 Household and Institutional Furniture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0028 # 10 Y:2023 10 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,953 $4,760 n/a
LE0547 # 01 Y:2023 01 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $846 $400 Implemented
LE0547 # 02 Y:2023 02 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,446 $1,500 Not Implemented
LE0547 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $602 $1,720 Implemented
LE0547 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,448 $13,930 Implemented
LE0547 # 05 Y:2023 05 2023 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $6,147 $30,000 Not Implemented
OK1086 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,012 $1,489 Implemented
OK1086 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $31,948 $382,200 Not Implemented
OK1086 # 03 Y:2023 03 2023 USE RADIANT HEATER FOR SPOT HEATING $8,472 $13,560 Not Implemented
OK1086 # 02 Y:2023 02 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $630 $330 Implemented
UU0212 # 05 Y:2023 05 2023 USE OPTIMUM THICKNESS INSULATION $4,220 $4,402 Not Implemented
UU0213 # 01 Y:2023 01 2023 USE POWER DURING OFF-PEAK PERIODS $7,487 $8,000 Not Implemented
UU0213 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $1,190 $3,000 Not Implemented
UU0212 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $4,400 $9,000 Not Implemented
UU0212 # 02 Y:2023 02 2023 REPLACE BOILER $11,580 $80,000 Not Implemented
UU0213 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $5,181 $18,250 Not Implemented
UU0213 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,602 $1,773 Not Implemented
UU0212 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $382 $1,370 Not Implemented
UU0212 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,149 $8,500 Not Implemented
UU0212 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,326 $21,555 Not Implemented
UU0212 # 06 Y:2023 06 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $425 $850 Not Implemented
UU0213 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $639 $1,950 Not Implemented
NC0659 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $267 $546 n/a
NC0659 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $787 $100 n/a
NC0659 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,329 $12,820 n/a