IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

83

matching recommendations
Reset
NAICS 337124 Metal Household Furniture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0372 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,241 $20,434 Not Implemented
MI0372 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,674 $120 Implemented
MI0372 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $1,658 $2,091 Not Implemented
MI0372 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,282 $1,980 Implemented
MI0372 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,103 $21,302 Implemented
MI0372 # 06 Y:2020 06 2020 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,113 $2,041 Not Implemented
UM0485 # 03 Y:2017 03 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,888 $3,500 n/a
UM0485 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,035 $2,500 n/a
UM0485 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $812 $1,500 n/a
UM0485 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,536 $1,000 n/a
SD0483 # 03 Y:2014 03 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,486 $2,845 Implemented
SD0483 # 07 Y:2014 07 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $783 $500 Implemented
SD0483 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,147 $500 Implemented
SD0483 # 01 Y:2014 01 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,026 $61,400 Implemented
SD0483 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $7,108 $21,254 Not Implemented
SD0483 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,633 $2,600 Implemented
SD0483 # 05 Y:2014 05 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,563 $3,243 Implemented
UA0113 # 02 Y:2014 02 2014 INSTALL SKYLIGHTS $31,556 $40,622 Not Implemented
UA0113 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,556 $321 Implemented
UA0113 # 05 Y:2014 05 2014 USE RADIANT HEATER FOR SPOT HEATING $10,526 $11,550 Not Implemented
UA0113 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,732 $800 Not Implemented
UA0113 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,580 $1,900 Implemented
UA0113 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,063 $93,733 Not Implemented
NC0326 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $6,606 $5,000 Implemented
NC0326 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,944 $2,000 Not Implemented