IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 3372 Office Furniture (including Fixtures) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0683 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $110 $0 Implemented
AM0683 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $170 $110 Not Implemented
AM0683 # 05 Y:2015 05 2015 USE SYNTHETIC LUBRICANT $390 $0 Implemented
AM0683 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,680 $8,610 Not Implemented
AM0683 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,280 $10 Implemented
AM0683 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,800 $1,000 Implemented
AM0683 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $800 $0 Not Implemented
TA0097 # 01 Y:2005 01 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $8,253 $0 Implemented
TA0097 # 02 Y:2005 02 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,829 $176 Not Implemented
TA0097 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,341 $1,038 Implemented
TA0097 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,277 $0 Not Implemented
TA0097 # 06 Y:2005 06 2005 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,320 $50 Not Implemented
TA0097 # 07 Y:2005 07 2005 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,904 $0 Implemented
TA0097 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $2,486 $270 Not Implemented
TA0055 # 10 Y:2003 10 2003 COVER OPEN TANKS $100 $0 Implemented
TA0055 # 09 Y:2003 09 2003 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $290 $0 Not Implemented
TA0055 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $535 $985 Not Implemented
TA0055 # 07 Y:2003 07 2003 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,675 $1,000 Implemented
TA0055 # 06 Y:2003 06 2003 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,260 $2,000 Not Implemented
TA0055 # 05 Y:2003 05 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $9,360 $0 Implemented
TA0055 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,400 $910 Implemented
TA0055 # 03 Y:2003 03 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,100 $46 Implemented
TA0055 # 02 Y:2003 02 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $36,000 $31,820 Implemented
TA0055 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $68,000 $0 Implemented
TA0052 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $465 $0 Implemented