IAC logo
IAC Assessment: TA0097
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0097
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2005
Principal Product Metal Storage Racks
NAICS 337215 - Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2542 - Partitions And Fixtures, Except Wood
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 280,000
Annual Production 11,000 Pieces
Production Hrs. Annual 5,572
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $229,364 4,063,930 kWh $0.06
Electricity Demand $77,114 10,601 kW-months/year $7.27
Natural Gas $478,026 42,261 MMBtu $11.31
TOTAL ENERGY COSTS $784,504
RECOMMENDED SAVINGS* $34,410 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,498
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz)
$ kWh $ kW-months/year $ $ $ gal
01: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$8,253
Cost:
-
- - - - $8,253 - - - -
-
kWh
-
-
kW-months/year
$8,253
-
$
-
-
gal
02: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$6,829
Cost:
$176
$5,794 98,722 $1,035 179 - - - - $5,794
98,722
kWh
$1,035
179
kW-months/year
-
-
$
-
-
gal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,341
Cost:
$1,038
$5,237 89,239 $1,104 191 - - - - $5,237
89,239
kWh
$1,104
191
kW-months/year
-
-
$
-
-
gal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,277
Cost:
-
$5,179 88,260 $1,098 190 - - - - $5,179
88,260
kWh
$1,098
190
kW-months/year
-
-
$
-
-
gal
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,486
Cost:
$270
$2,486 42,365 - - - - - - $2,486
42,365
kWh
-
-
kW-months/year
-
-
$
-
-
gal
06: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$2,320
Cost:
$50
- - - - - - $2,320 1,303 -
-
kWh
-
-
kW-months/year
-
-
$
$2,320
1,303
gal
07: 2.4238 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING Savings:
$1,904
Cost:
-
$610 10,392 $1,294 223 - - - - $610
10,392
kWh
$1,294
223
kW-months/year
-
-
$
-
-
gal
TOTAL RECOMMENDED Savings:
$34,410
Cost:
$1,534
$19,306 328,978 $4,531 783 $8,253 - $2,320 1,303 $19,306
328,978
kWh
$4,531
783
kW-months/year
$8,253
-
$
$2,320
1,303
gal
TOTAL IMPLEMENTED Savings:
$16,498
Cost:
$1,038
$5,847 99,631 $2,398 414 $8,253 - - - $5,847
99,631
kWh
$2,398
414
kW-months/year
$8,253
-
$
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ $ $ gal
Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz)