Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
313
matching recommendationsNAICS | 3372 | Office Furniture (including Fixtures) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0500 # 10 Y:2013 | 10 | 2013 | METER WASTE WATER | $4,155 | $4,200 | Implemented |
NC0500 # 07 Y:2013 | 07 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $577 | $875 | Implemented |
NC0500 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,558 | $100 | Implemented |
NC0500 # 09 Y:2013 | 09 | 2013 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $286 | $750 | Not Implemented |
NC0500 # 12 Y:2013 | 12 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,622 | $775 | Implemented |
NC0500 # 13 Y:2013 | 13 | 2013 | INSTALL OCCUPANCY SENSORS | $596 | $1,565 | Not Implemented |
NC0500 # 04 Y:2013 | 04 | 2013 | REDUCE FLUID FLOW RATES | $34,287 | $18,000 | Implemented |
NC0500 # 02 Y:2013 | 02 | 2013 | MAKE A NEW BY-PRODUCT | $86,815 | $250,000 | Implemented |
NC0500 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,293 | $125 | Implemented |
NC0500 # 03 Y:2013 | 03 | 2013 | AIR CONDITION ONLY SPACE NECESSARY | $4,146 | $200 | Implemented |
NC0500 # 01 Y:2013 | 01 | 2013 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $59,689 | $250,000 | Not Implemented |
NC0500 # 08 Y:2013 | 08 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,389 | $7,000 | Implemented |
NC0500 # 11 Y:2013 | 11 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $456 | $2,704 | Not Implemented |
UA0094 # 09 Y:2013 | 09 | 2013 | OPTIMIZE PLANT POWER FACTOR | $6,000 | $14,980 | Not Implemented |
UA0094 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,674 | $4,500 | Implemented |
UA0094 # 06 Y:2013 | 06 | 2013 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $6,212 | $16,350 | Implemented |
UA0094 # 07 Y:2013 | 07 | 2013 | INSULATE BARE EQUIPMENT | $7,049 | $12,413 | Not Implemented |
UA0094 # 05 Y:2013 | 05 | 2013 | BURN WOOD BY-PRODUCTS FOR HEAT | $290,469 | $297,000 | Not Implemented |
UA0094 # 08 Y:2013 | 08 | 2013 | DISCONNECT BALLASTS | $13,800 | $8,100 | Implemented |
UA0094 # 01 Y:2013 | 01 | 2013 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $52,762 | $41,601 | Implemented |
UA0094 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,672 | $4,500 | Implemented |
UA0094 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,165 | $800 | Implemented |
UMS012 # 02 Y:2012 | 02 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $553,000 | $750,000 | Not Implemented |
UMS012 # 01 Y:2012 | 01 | 2012 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $347,000 | $600,000 | Not Implemented |
WM0005 # 05 Y:2012 | 05 | 2012 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,321 | $95 | Implemented |