IAC logo
IAC Assessment: NC0500
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0500
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2013
Principal Product Commercial display shelving
NAICS 337215 - Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2541 - Wood Partitions And Fixtures
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 387,000
Annual Production 100,000 Pieces
Production Hrs. Annual 2,250
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $216,156 2,933,000 kWh $0.07
Electricity Demand $125,076 9,362 kW-months/year $13.36
Electricity Fees $(-17,857) - $ -
Natural Gas $31,925 3,434 MMBtu $9.30
TOTAL ENERGY COSTS $371,611
RECOMMENDED SAVINGS* $208,869 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $147,842
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Fuel Oil #2 Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $
01: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$59,689
Cost:
$250,000
$4,953 67,200 $87,960 9,134 $(-28,224) (-1,092) - - - - - - $(-5,000) - - - $4,953
67,200
kWh
$87,960
9,134
kW-months/year
$(-28,224)
(-1,092)
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$(-5,000)
-
$
-
-
$
02: 3.1182 MAKE A NEW BY-PRODUCT Savings:
$86,815
Cost:
$250,000
$(-6,185) (-83,925) - - - - - - $93,000 4,650,000 - - - - - - $(-6,185)
(-83,925)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$93,000
4,650,000
lb
-
-
$
-
-
$
-
-
$
03: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$4,146
Cost:
$200
$2,329 31,600 $1,817 136 - - - - - - - - - - - - $2,329
31,600
kWh
$1,817
136
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.5123 REDUCE FLUID FLOW RATES Savings:
$34,287
Cost:
$18,000
$16,941 229,861 $17,346 1,298 - - - - - - - - - - - - $16,941
229,861
kWh
$17,346
1,298
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,558
Cost:
$100
$1,649 22,380 $449 34 - - - - - - $(-300) - - - $(-240) - $1,649
22,380
kWh
$449
34
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$(-300)
-
$
-
-
$
$(-240)
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,293
Cost:
$125
$1,627 22,079 $1,666 125 - - - - - - - - - - - - $1,627
22,079
kWh
$1,666
125
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$577
Cost:
$875
$577 7,825 - - - - - - - - - - - - - - $577
7,825
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$9,389
Cost:
$7,000
$9,389 127,395 - - - - - - - - - - - - - - $9,389
127,395
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
09: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$286
Cost:
$750
$141 1,916 $145 11 - - - - - - - - - - - - $141
1,916
kWh
$145
11
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
10: 3.4155 METER WASTE WATER Savings:
$4,155
Cost:
$4,200
- - - - - - $4,155 656,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,155
656,000
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$456
Cost:
$2,704
$226 3,060 $230 17 - - - - - - - - - - - - $226
3,060
kWh
$230
17
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
12: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,622
Cost:
$775
$1,586 21,505 $1,623 121 - - - - - - - - - - $413 - $1,586
21,505
kWh
$1,623
121
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
$413
-
$
13: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$596
Cost:
$1,565
$596 8,088 - - - - - - - - - - - - - - $596
8,088
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$208,869
Cost:
$536,294
$33,829 458,984 $111,236 10,876 $(-28,224) (-1,092) $4,155 656,000 $93,000 4,650,000 $(-300) - $(-5,000) - $173 - $33,829
458,984
kWh
$111,236
10,876
kW-months/year
$(-28,224)
(-1,092)
MMBtu
$4,155
656,000
Tgal
$93,000
4,650,000
lb
$(-300)
-
$
$(-5,000)
-
$
$173
-
$
TOTAL IMPLEMENTED Savings:
$147,842
Cost:
$281,275
$27,913 378,720 $22,901 1,714 - - $4,155 656,000 $93,000 4,650,000 $(-300) - - - $173 - $27,913
378,720
kWh
$22,901
1,714
kW-months/year
-
-
MMBtu
$4,155
656,000
Tgal
$93,000
4,650,000
lb
$(-300)
-
$
-
-
$
$173
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Fuel Oil #2 Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Fuel Oil #2 Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost