Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
581
matching recommendationsNAICS | 33721 | Office Furniture (including Fixtures) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0457 # 07 Y:2025 | 07 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,839 | $2,400 | n/a |
MI0457 # 10 Y:2025 | 10 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,337 | $10,164 | n/a |
MI0457 # 06 Y:2025 | 06 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,391 | $1,360 | n/a |
MI0457 # 08 Y:2025 | 08 | 2025 | METER WASTE WATER | $2,180 | $2,348 | n/a |
MI0457 # 03 Y:2025 | 03 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,056 | $600 | n/a |
MI0457 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $5,576 | $918 | n/a |
MI0457 # 09 Y:2025 | 09 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,712 | $6,585 | n/a |
MI0457 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $26,962 | $1,320 | n/a |
MI0457 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,158 | $1,980 | n/a |
MI0457 # 01 Y:2025 | 01 | 2025 | REDUCE VENTILATION AIR | $15,201 | $0 | n/a |
CI0040 # 07 Y:2024 | 07 | 2024 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $2,874 | $7,990 | n/a |
CI0040 # 06 Y:2024 | 06 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,911 | $6,699 | n/a |
CI0040 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $34,278 | $75,000 | n/a |
CI0040 # 03 Y:2024 | 03 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,951 | $31,000 | n/a |
CI0040 # 04 Y:2024 | 04 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $7,997 | $19,000 | n/a |
CI0040 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,161 | $288,868 | n/a |
CI0040 # 05 Y:2024 | 05 | 2024 | USE PHOTOCELL CONTROLS | $5,246 | $7,920 | n/a |
WM0232 # 03 Y:2025 | 03 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,500 | $360 | n/a |
WM0232 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,625 | $22,658 | n/a |
WM0232 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,332 | $2,750 | n/a |
WM0232 # 01 Y:2025 | 01 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,149 | $46,220 | n/a |
WM0232 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $778 | $800 | n/a |
DL0246 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,655 | $181,095 | n/a |
DL0246 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,062 | $21,900 | n/a |
DL0246 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $1,262 | $8,600 | n/a |