Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsNAICS | 33721 | Office Furniture (including Fixtures) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0030 # 03 Y:2008 | 03 | 2008 | OPTIMIZE PLANT POWER FACTOR | $4,100 | $22,600 | Not Implemented |
TT0030 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,650 | $2,900 | Not Implemented |
TT0030 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $99,250 | $272,800 | Not Implemented |
WV0385 # 11 Y:2008 | 11 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,425 | $4,393 | Implemented |
WV0385 # 04 Y:2008 | 04 | 2008 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $14,783 | $5,000 | Not Implemented |
WV0385 # 03 Y:2008 | 03 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,879 | $21,600 | Not Implemented |
WV0385 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,198 | $81,425 | Implemented |
WV0385 # 01 Y:2008 | 01 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $40,090 | $4,000 | Not Implemented |
WV0385 # 14 Y:2008 | 14 | 2008 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $324 | $50 | Not Implemented |
WV0385 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,980 | $0 | Implemented |
WV0385 # 09 Y:2008 | 09 | 2008 | IMPROVE LUBRICATION PRACTICES | $2,864 | $2,950 | Not Implemented |
WV0385 # 07 Y:2008 | 07 | 2008 | INSULATE BARE EQUIPMENT | $3,100 | $140 | Implemented |
WV0385 # 12 Y:2008 | 12 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,167 | $925 | Not Implemented |
WV0385 # 10 Y:2008 | 10 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,986 | $792 | Implemented |
WV0385 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,599 | $548 | Implemented |
WV0385 # 05 Y:2008 | 05 | 2008 | STANDARDIZE MOTOR INVENTORY | $6,638 | $763 | Implemented |
WV0385 # 13 Y:2008 | 13 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $527 | $100 | Implemented |
MZ0024 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,506 | $5,600 | Not Implemented |
MZ0024 # 05 Y:2008 | 05 | 2008 | USE OPTIMUM THICKNESS INSULATION | $430 | $800 | Not Implemented |
MZ0024 # 03 Y:2008 | 03 | 2008 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $828 | $370 | Not Implemented |
MZ0024 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,181 | $32,800 | Implemented |
MZ0024 # 01 Y:2008 | 01 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $764 | $900 | Implemented |
DL0020 # 06 Y:2008 | 06 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $63 | $130 | Not Implemented |
DL0020 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $740 | $350 | Implemented |
DL0020 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,334 | $34,037 | Implemented |