IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

133

matching recommendations
Reset
NAICS 337211 Wood Office Furniture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2215 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $806 $1,778 Not Implemented
UW2215 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $732 $2,080 Not Implemented
UW2215 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $371 $352 Not Implemented
UW2215 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $41,579 $336,469 Not Implemented
SD0620 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,884 $40,350 Implemented
SD0620 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,249 $18,262 Implemented
SD0620 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,133 $1,050 Implemented
NC0668 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $2,314 $8,000 n/a
NC0668 # 05 Y:2021 05 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,271 $22,000 n/a
NC0668 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $2,843 $6,325 n/a
NC0668 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $69 $280 n/a
NC0668 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,512 $5,587 n/a
NC0657 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $592 $400 Not Implemented
NC0657 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $194 $493 Implemented
NC0657 # 01 Y:2020 01 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,055 $3,404 Not Implemented
NC0657 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,082 $5,265 Implemented
NC0657 # 05 Y:2020 05 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,980 $30,000 Not Implemented
CL1809 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,401 $900 Not Implemented
CL1809 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,602 $11,662 Implemented
CL1809 # 01 Y:2018 01 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $21,846 $250 Implemented
SF0521 # 08 Y:2018 08 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $94,006 $487,058 Implemented
SF0521 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,270 $22,190 Implemented
SF0521 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,001 $1,610 Implemented
SF0521 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,444 $3,798 Implemented
SF0521 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,634 $44,294 Implemented