Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,172
matching recommendationsNAICS | 339 | Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0368 # 09 Y:2020 | 09 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $626 | $1,661 | Implemented |
NL0040 # 03 Y:2019 | 03 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $25,402 | $1,697 | Implemented |
NL0040 # 04 Y:2019 | 04 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $16,450 | $4,500 | Implemented |
NL0040 # 05 Y:2019 | 05 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $10,400 | $51,350 | Implemented |
NL0040 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,049 | $18,439 | Implemented |
NL0040 # 08 Y:2019 | 08 | 2019 | RECYCLE WHITE WATER | $2,649 | $1,000 | Implemented |
WV0587 # 04 Y:2019 | 04 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,887 | $4,500 | Implemented |
WV0587 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,112 | $300 | Implemented |
WV0587 # 07 Y:2019 | 07 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $5,261 | $650 | Implemented |
WV0587 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,563 | $600 | Implemented |
WV0587 # 11 Y:2019 | 11 | 2019 | INSULATE BARE EQUIPMENT | $2,257 | $2,624 | Implemented |
WV0587 # 12 Y:2019 | 12 | 2019 | INSTALL OCCUPANCY SENSORS | $1,787 | $1,750 | Implemented |
SU0487 # 02 Y:2019 | 02 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $185 | $0 | Implemented |
SU0487 # 04 Y:2019 | 04 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,098 | $165 | Implemented |
SU0487 # 05 Y:2019 | 05 | 2019 | ELIMINATE/REDUCE AN OPERATION | $12,498 | $9,690 | Implemented |
UF0537 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,091 | $8,377 | Implemented |
UF0537 # 06 Y:2019 | 06 | 2019 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,428 | $500 | Implemented |
UF0537 # 07 Y:2019 | 07 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,046 | $914 | Implemented |
UF0537 # 09 Y:2019 | 09 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $37,600 | $100,000 | Implemented |
LE0481 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,057 | $40 | Implemented |
LE0481 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,547 | $11,688 | Implemented |
LE0481 # 05 Y:2019 | 05 | 2019 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $50,429 | $162,000 | Implemented |
LE0481 # 07 Y:2019 | 07 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $13,688 | $55,000 | Implemented |
LE0481 # 09 Y:2019 | 09 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $390 | $1,850 | Implemented |
WV0583 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,290 | $53,184 | Implemented |