IAC Assessment: UU0167
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0167
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2020
Principal Product Dialyzers, Saline Bags
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales >$500,000,000
# of Employees 1,800
Plant Area (Sq.Ft.) 120,000
Annual Production 100,000,000 Units
Production Hrs. Annual 8,700
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $990,000 14,154,551 kWh $0.07
Natural Gas $717,178 204,908 MMBtu $3.50
TOTAL ENERGY COSTS $1,707,178
RECOMMENDED SAVINGS* $600,058 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $115,777
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Usage Personnel Changes Electricity Usage Natural Gas Water Usage Personnel Changes
$ kWh $ MMBtu $ Tgal $ $
01: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$471,950
Cost:
$2,795,000
$777,000 11,100,000 $(-186,550) (-53,300) - - $(-118,500) - $777,000
11,100,000
kWh
$(-186,550)
(-53,300)
MMBtu
-
-
Tgal
$(-118,500)
-
$
02: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$72,249
Cost:
$60,000
$(-6,251) (-89,300) - - $78,500 15,700 - - $(-6,251)
(-89,300)
kWh
-
-
MMBtu
$78,500
15,700
Tgal
-
-
$
03: 3.4146 CHANGE METHOD OF DEIONIZED WATER PRODUCTION Savings:
$35,350
Cost:
$180,000
$27,650 395,000 $7,700 2,200 - - - - $27,650
395,000
kWh
$7,700
2,200
MMBtu
-
-
Tgal
-
-
$
04: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$12,331
Cost:
$22,500
- - $12,331 3,523 - - - - -
-
kWh
$12,331
3,523
MMBtu
-
-
Tgal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,178
Cost:
$17,274
$8,178 116,834 - - - - - - $8,178
116,834
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$600,058
Cost:
$3,074,774
$806,577 11,522,534 $(-166,520) (-47,577) $78,500 15,700 $(-118,500) - $806,577
11,522,534
kWh
$(-166,520)
(-47,577)
MMBtu
$78,500
15,700
Tgal
$(-118,500)
-
$
TOTAL IMPLEMENTED Savings:
$115,777
Cost:
$257,274
$29,577 422,534 $7,700 2,200 $78,500 15,700 - - $29,577
422,534
kWh
$7,700
2,200
MMBtu
$78,500
15,700
Tgal
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $
Electricity Usage Natural Gas Water Usage Personnel Changes Electricity Usage Natural Gas Water Usage Personnel Changes