IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
NAICS 339 Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0710 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $370 $1,170 Not Implemented
CO0710 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $60 Implemented
CO0710 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,710 $340 Implemented
CO0710 # 01 Y:2015 01 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,950 $3,660 Not Implemented
CO0686 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,120 $4,630 Not Implemented
CO0686 # 04 Y:2014 04 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $6,330 $27,820 Implemented
CO0686 # 01 Y:2014 01 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,160 $8,890 Not Implemented
CO0686 # 03 Y:2014 03 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,690 $0 Implemented
CO0686 # 05 Y:2014 05 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,080 $1,500 Implemented
CO0686 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,170 $6,690 Not Implemented
CO0672 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,690 $5,660 Not Implemented
CO0672 # 02 Y:2013 02 2013 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $16,940 $58,410 Not Implemented
CO0672 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,070 $250 Implemented
CO0672 # 04 Y:2013 04 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,600 $500 Not Implemented
CO0672 # 05 Y:2013 05 2013 USE SOLAR HEAT TO MAKE ELECTRICTY $2,400 $32,500 Not Implemented
CO0646 # 07 Y:2011 07 2011 INSTALL WIND POWERED ELECTRIC GENERATOR $270 $5,260 Not Implemented
CO0646 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,340 $2,730 Implemented
CO0646 # 08 Y:2011 08 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $150 $40 Implemented
CO0646 # 05 Y:2011 05 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $1,910 $35,000 Not Implemented
CO0646 # 04 Y:2011 04 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,080 $14,690 Not Implemented
CO0646 # 03 Y:2011 03 2011 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $2,120 $10,000 Implemented
CO0646 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,270 $7,320 Not Implemented
CO0646 # 01 Y:2011 01 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,270 $62,380 Not Implemented
CO0581 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,190 $14,660 Not Implemented
CO0581 # 02 Y:2006 02 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $430 $430 Not Implemented