Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2014 |
Principal Product | Orthopaedic and Surgical Instruments |
NAICS | 339112 - Surgical and Medical Instrument Manufacturing |
SIC | 3841 - Surgical And Medical Instruments |
Sales | $10,000,000-$50,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 15,000 |
Annual Production | 500,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $69,675 | 1,552,560 | kWh | $0.04 |
Electricity Demand | $73,322 | 3,362 | kW-months/year | $21.81 |
Electricity Fees | $636 | - | $ | - |
Natural Gas | $1,893 | 216 | MMBtu | $8.76 |
TOTAL ENERGY COSTS | $145,526 | |||
RECOMMENDED SAVINGS* | $27,550 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,100 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $4,160 Cost: $8,890 |
$2,550 | 53,200 | $1,610 | 73 | - | - | - | - |
$2,550 53,200 kWh |
$1,610 73 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,170 Cost: $6,690 |
$1,050 | 22,000 | $2,120 | 96 | - | - | - | - |
$1,050 22,000 kWh |
$2,120 96 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $6,690 Cost: - |
$3,840 | 80,200 | $2,850 | 129 | - | - | - | - |
$3,840 80,200 kWh |
$2,850 129 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM |
Savings: $6,330 Cost: $27,820 |
$2,000 | 41,700 | $4,330 | 182 | - | - | - | - |
$2,000 41,700 kWh |
$4,330 182 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $6,080 Cost: $1,500 |
- | - | - | - | - | - | $6,080 | - |
- - kWh |
- - kW-months/year |
- - $ |
$6,080 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,120 Cost: $4,630 |
$580 | 12,200 | $520 | 23 | $20 | - | - | - |
$580 12,200 kWh |
$520 23 kW-months/year |
$20 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,550 Cost: $49,530 |
$10,020 | 209,300 | $11,430 | 503 | $20 | - | $6,080 | - | $10,020 209,300 kWh |
$11,430 503 kW-months/year |
$20 - $ |
$6,080 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,100 Cost: $29,320 |
$5,840 | 121,900 | $7,180 | 311 | - | - | $6,080 | - | $5,840 121,900 kWh |
$7,180 311 kW-months/year |
- - $ |
$6,080 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes |