Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
295
matching recommendationsNAICS | 339 | Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0429 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $172,404 | $974,914 | n/a |
MI0429 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,739 | $1,660 | n/a |
MI0429 # 08 Y:2023 | 08 | 2023 | INSULATE BARE EQUIPMENT | $1,608 | $1,012 | n/a |
MI0429 # 06 Y:2023 | 06 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,831 | $6,950 | n/a |
MI0429 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,166 | $12,997 | n/a |
MI0429 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $16,344 | $70,840 | n/a |
MI0429 # 03 Y:2023 | 03 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $25,267 | $0 | n/a |
MI0429 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO HEAT WATER | $1,687 | $8,166 | n/a |
MI0424 # 01 Y:2023 | 01 | 2023 | INCREASE EFFICIENCY OF TRUCKS | $32,721 | $6,400 | Implemented |
MI0424 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,328 | $0 | Implemented |
MI0424 # 04 Y:2023 | 04 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,786 | $580 | Not Implemented |
MI0424 # 02 Y:2023 | 02 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,951 | $120 | Implemented |
MI0424 # 05 Y:2023 | 05 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,147 | $118 | Implemented |
MI0424 # 06 Y:2023 | 06 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $375 | $1,215 | Implemented |
UF0589 # 02 Y:2023 | 02 | 2023 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $505,092 | $2,115,660 | Implemented |
UF0589 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $71,810 | $25,340 | Implemented |
UF0589 # 13 Y:2023 | 13 | 2023 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $4,532 | $754 | Implemented |
UF0589 # 09 Y:2023 | 09 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,438 | $0 | Implemented |
UF0589 # 03 Y:2023 | 03 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $130,403 | $95,736 | Not Implemented |
UF0589 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $920,434 | $2,793,000 | Implemented |
UF0589 # 08 Y:2023 | 08 | 2023 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $13,274 | $30,000 | Implemented |
UF0589 # 15 Y:2023 | 15 | 2023 | INSTALL OCCUPANCY SENSORS | $2,868 | $9,968 | Implemented |
UF0589 # 06 Y:2023 | 06 | 2023 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $18,200 | $14,400 | Implemented |
UF0589 # 17 Y:2023 | 17 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $88,974 | $10,000 | Implemented |
UF0589 # 16 Y:2023 | 16 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $2,322 | $0 | Implemented |