Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2024
Principal Product Radiation Therapy Devices
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 35,000
Annual Production 484,773 Units
Production Hrs. Annual 4,940
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,908 1,087,200 kWh $0.07
Electricity Demand $34,191 2,685 kW-months/year $12.73
Electricity Fees $18,889 - $ -
TOTAL ENERGY COSTS $126,988
RECOMMENDED SAVINGS* $121,814 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$80,652
Cost:
$322,608
$43,978 646,737 $36,674 2,880 - - - - - - $43,978
646,737
kWh
$36,674
2,880
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$21,638
Cost:
$12,552
$(-248) (-3,650) $(-536) (-42) - - $22,422 - - - $(-248)
(-3,650)
kWh
$(-536)
(-42)
kW-months/year
-
-
$
$22,422
-
$
-
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$7,571
Cost:
$5,849
$5,175 76,104 $2,396 188 - - - - - - $5,175
76,104
kWh
$2,396
188
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$5,125
Cost:
$25,440
$2,793 41,076 $2,332 183 - - - - - - $2,793
41,076
kWh
$2,332
183
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,749
Cost:
$327
$1,749 25,723 - - - - - - - - $1,749
25,723
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,368
Cost:
$202
$1,368 20,123 - - - - - - - - $1,368
20,123
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
07: 2.7421 REDUCE GLAZED AREAS IN BUILDINGS Savings:
$1,097
Cost:
$1,075
$1,097 16,129 - - - - - - - - $1,097
16,129
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,073
Cost:
-
$644 9,467 - - $248 - - - $181 - $644
9,467
kWh
-
-
kW-months/year
$248
-
$
-
-
$
$181
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,015
Cost:
-
$1,015 14,925 - - - - - - - - $1,015
14,925
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
10: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$526
Cost:
$1,500
$526 7,739 - - - - - - - - $526
7,739
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$121,814
Cost:
$369,553
$58,097 854,373 $40,866 3,209 $248 - $22,422 - $181 - $58,097
854,373
kWh
$40,866
3,209
kW-months/year
$248
-
$
$22,422
-
$
$181
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost