Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
113
matching recommendationsNAICS | 339 | Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0387 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,616 | $3,786 | Not Implemented |
SD0387 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,871 | $4,125 | Not Implemented |
SD0387 # 01 Y:2006 | 01 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $104,355 | $91,000 | Not Implemented |
SD0387 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $900 | $2,690 | Not Implemented |
SD0387 # 04 Y:2006 | 04 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $445 | $1,000 | Not Implemented |
UD0748 # 02 Y:2006 | 02 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,546 | $0 | Implemented |
UD0748 # 05 Y:2006 | 05 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $303 | $108 | Implemented |
UD0748 # 03 Y:2006 | 03 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,200 | $840 | Implemented |
UD0748 # 01 Y:2006 | 01 | 2006 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $432,000 | $143,750 | Not Implemented |
UD0748 # 04 Y:2006 | 04 | 2006 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,988 | $2,960 | Not Implemented |
MS0297 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,825 | $225 | Implemented |
MS0297 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,005 | $7,451 | Not Implemented |
MS0297 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,548 | $26,994 | Not Implemented |
MS0297 # 01 Y:2006 | 01 | 2006 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $45,413 | $160,000 | Not Implemented |
SF0331 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,020 | $2,819 | Not Implemented |
SF0331 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $371 | $888 | Implemented |
SF0331 # 07 Y:2006 | 07 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $885 | $2,838 | Not Implemented |
SF0331 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,535 | $4,389 | Implemented |
SF0331 # 02 Y:2006 | 02 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $16,440 | $3,828 | Implemented |
SF0331 # 03 Y:2006 | 03 | 2006 | OPTIMIZE PLANT POWER FACTOR | $3,422 | $1,950 | Not Implemented |
SF0331 # 01 Y:2006 | 01 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,466 | $169 | Implemented |
UF0378 # 08 Y:2006 | 08 | 2006 | ELIMINATE PRACTICE OF MIXING WASTE STREAMS | $3,397 | $507 | Implemented |
UF0378 # 04 Y:2006 | 04 | 2006 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $10,260 | $2,640 | Implemented |
UF0378 # 02 Y:2006 | 02 | 2006 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $10,965 | $5,044 | Implemented |
UF0378 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,337 | $598 | Implemented |