Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
185
matching recommendationsNAICS | 339 | Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0233 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,400 | $1,660 | Implemented |
MI0233 # 03 Y:2012 | 03 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $44,157 | $11,632 | Not Implemented |
MI0233 # 02 Y:2012 | 02 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $150,126 | $80 | Implemented |
MI0233 # 01 Y:2012 | 01 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $246,388 | $33,021 | Implemented |
MI0233 # 07 Y:2012 | 07 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,508 | $5,069 | Not Implemented |
MI0233 # 12 Y:2012 | 12 | 2012 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,056 | $843 | Implemented |
MI0233 # 05 Y:2012 | 05 | 2012 | OPTIMIZE PLANT POWER FACTOR | $10,216 | $11,120 | Not Implemented |
MI0233 # 09 Y:2012 | 09 | 2012 | INSTALL OCCUPANCY SENSORS | $5,193 | $800 | Implemented |
MI0233 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,406 | $1,060 | Not Implemented |
MI0233 # 11 Y:2012 | 11 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,084 | $80 | Implemented |
MI0233 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,631 | $2,050 | Implemented |
MI0233 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,430 | $2,665 | Implemented |
MI0230 # 02 Y:2012 | 02 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $146,160 | $70,200 | Not Implemented |
MI0230 # 13 Y:2012 | 13 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,524 | $80 | Not Implemented |
MI0230 # 12 Y:2012 | 12 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $6,487 | $2,848 | Implemented |
MI0230 # 11 Y:2012 | 11 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,581 | $3,569 | Not Implemented |
MI0230 # 10 Y:2012 | 10 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,962 | $1,589 | Implemented |
MI0230 # 09 Y:2012 | 09 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,652 | $6,802 | Not Implemented |
MI0230 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,512 | $1,040 | Implemented |
MI0230 # 07 Y:2012 | 07 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $15,150 | $4,720 | Not Implemented |
MI0230 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,707 | $1,660 | Implemented |
MI0230 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,101 | $41,600 | Implemented |
MI0230 # 03 Y:2012 | 03 | 2012 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $88,716 | $46,097 | Implemented |
MI0230 # 04 Y:2012 | 04 | 2012 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $64,249 | $12,488 | Not Implemented |
MI0230 # 01 Y:2012 | 01 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $185,551 | $480 | Implemented |