IAC logo
IAC Assessment: MI0233
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0233
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2012
Principal Product Pharmaceutical Preparation Manufacturing
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 3842 - Surgical Appliances And Supplies
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 80,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 4,992
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,406,079 5,418,475 kWh $0.26
Electricity Demand $135,011 13,335 kW-months/year $10.12
Electricity Fees $5,541 - $ -
TOTAL ENERGY COSTS $1,546,631
RECOMMENDED SAVINGS* $497,595 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $430,308
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$246,388
Cost:
$33,021
$225,227 869,604 $21,161 2,090 $225,227
869,604
kWh
$21,161
2,090
kW-months/year
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$150,126
Cost:
$80
$143,393 553,639 $6,733 665 $143,393
553,639
kWh
$6,733
665
kW-months/year
03: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$44,157
Cost:
$11,632
$40,360 155,829 $3,797 375 $40,360
155,829
kWh
$3,797
375
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,400
Cost:
$1,660
$11,803 45,572 $597 59 $11,803
45,572
kWh
$597
59
kW-months/year
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,216
Cost:
$11,120
- - $10,216 1,009 -
-
kWh
$10,216
1,009
kW-months/year
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,406
Cost:
$1,060
$6,771 26,140 $635 63 $6,771
26,140
kWh
$635
63
kW-months/year
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$5,508
Cost:
$5,069
$5,032 19,428 $476 47 $5,032
19,428
kWh
$476
47
kW-months/year
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,430
Cost:
$2,665
$4,964 19,163 $466 46 $4,964
19,163
kWh
$466
46
kW-months/year
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,193
Cost:
$800
$4,747 18,330 $446 44 $4,747
18,330
kWh
$446
44
kW-months/year
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,631
Cost:
$2,050
$4,226 16,473 $405 40 $4,226
16,473
kWh
$405
40
kW-months/year
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,084
Cost:
$80
$2,719 10,499 $365 36 $2,719
10,499
kWh
$365
36
kW-months/year
12: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$3,056
Cost:
$843
$2,793 10,783 $263 26 $2,793
10,783
kWh
$263
26
kW-months/year
TOTAL RECOMMENDED Savings:
$497,595
Cost:
$70,080
$452,035 1,745,460 $45,560 4,500 $452,035
1,745,460
kWh
$45,560
4,500
kW-months/year
TOTAL IMPLEMENTED Savings:
$430,308
Cost:
$41,199
$399,872 1,544,063 $30,436 3,006 $399,872
1,544,063
kWh
$30,436
3,006
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand