IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
Reset
NAICS 339 Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0385 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,589 $6,672 Implemented
MI0385 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,047 $1,660 Implemented
MI0385 # 06 Y:2020 06 2020 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,866 $4,760 Implemented
MI0385 # 07 Y:2020 07 2020 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,275 $234 Implemented
MI0385 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,898 $2,100 Implemented
MI0385 # 04 Y:2020 04 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,719 $3,215 Not Implemented
MI0385 # 05 Y:2020 05 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,338 $100 Not Implemented
MI0385 # 08 Y:2020 08 2020 INSULATE BARE EQUIPMENT $754 $1,614 Not Implemented
SU0501 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $556 $999 Not Implemented
SU0501 # 05 Y:2020 05 2020 REDUCE VENTILATION AIR $273 $882 Not Implemented
SU0501 # 02 Y:2020 02 2020 DISCONNECT BALLASTS $919 $180 Not Implemented
SU0501 # 01 Y:2020 01 2020 ELIMINATE/REDUCE AN OPERATION $557 $20 Not Implemented
SU0501 # 03 Y:2020 03 2020 ELIMINATE/REDUCE AN OPERATION $2,583 $2,772 Not Implemented
CL2012 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,598 $22,698 Not Implemented
CL2012 # 02 Y:2020 02 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $81,451 $690,939 Not Implemented
CL2012 # 03 Y:2020 03 2020 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $16,920 $0 Not Implemented
CL2012 # 04 Y:2020 04 2020 PAY UTILITY BILLS ON TIME $770 $0 Not Implemented
IP0139 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,551 $36 Implemented
IP0139 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84,001 $51,911 Implemented
IP0139 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $647 $1,350 Implemented
IP0139 # 05 Y:2020 05 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $37,750 $333,343 Not Implemented
IP0139 # 01 Y:2020 01 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,243 $0 Implemented
NC0650 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,314 $20,000 Implemented
NC0650 # 05 Y:2020 05 2020 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $955 $2,350 Implemented
NC0650 # 06 Y:2020 06 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,730 $1,200 Implemented