IAC Assessment: MI0385
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2020
Principal Product Medical Devices
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 26,000
Annual Production 5,300,000 Pieces
Production Hrs. Annual 8,400
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $266,631 1,554,089 kWh $0.17
Electricity Demand $25,500 2,838 kW-months/year $8.99
Electricity Fees $2,618 - $ -
TOTAL ENERGY COSTS $294,749
RECOMMENDED SAVINGS* $39,486 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,675
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,589
Cost:
$6,672
$12,529 73,058 $1,060 118 - - $12,529
73,058
kWh
$1,060
118
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,047
Cost:
$1,660
$6,573 38,328 $474 53 - - $6,573
38,328
kWh
$474
53
kW-months/year
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,898
Cost:
$2,100
$6,296 36,709 $602 67 - - $6,296
36,709
kWh
$602
67
kW-months/year
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$5,719
Cost:
$3,215
$5,333 31,096 $386 43 - - $5,333
31,096
kWh
$386
43
kW-months/year
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,338
Cost:
$100
- - - - $2,338 - -
-
kWh
-
-
kW-months/year
$2,338
-
$
06: 2.4238 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING Savings:
$1,866
Cost:
$4,760
$1,736 10,122 $130 14 - - $1,736
10,122
kWh
$130
14
kW-months/year
-
-
$
07: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$1,275
Cost:
$234
$1,109 6,468 $166 18 - - $1,109
6,468
kWh
$166
18
kW-months/year
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$754
Cost:
$1,614
$616 3,592 $138 15 - - $616
3,592
kWh
$138
15
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$39,486
Cost:
$20,355
$34,192 199,373 $2,956 329 $2,338 - $34,192
199,373
kWh
$2,956
329
kW-months/year
$2,338
-
$
TOTAL IMPLEMENTED Savings:
$30,675
Cost:
$15,426
$28,243 164,685 $2,432 271 - - $28,243
164,685
kWh
$2,432
271
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $