Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
109
matching recommendationsNAICS | 339 | Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0260 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,696 | $8,277 | n/a |
UU0260 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $726 | $3,000 | n/a |
UU0260 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,557 | $6,277 | n/a |
UU0260 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $27,825 | $247,680 | n/a |
UU0260 # 02 Y:2024 | 02 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,585 | $5,800 | n/a |
UU0260 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $489 | $1,818 | n/a |
OK1127 # 07 Y:2024 | 07 | 2024 | OPTIMIZE PLANT POWER FACTOR | $1,583 | $11,180 | n/a |
OK1127 # 03 Y:2024 | 03 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,589 | $975 | n/a |
OK1127 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,761 | $262,800 | n/a |
OK1127 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,612 | $4,557 | n/a |
OK1127 # 06 Y:2024 | 06 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $2,477 | $5,850 | n/a |
OK1127 # 05 Y:2024 | 05 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $6,939 | $58,500 | n/a |
OK1127 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $565 | $3,300 | n/a |
UF0621 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $26,440 | $12,390 | n/a |
UF0621 # 11 Y:2024 | 11 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $11,856 | $4,760 | n/a |
UF0621 # 12 Y:2024 | 12 | 2024 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $8,191 | $40,000 | n/a |
UF0621 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,446 | $25,340 | n/a |
UF0621 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $1,807 | $3,048 | n/a |
UF0621 # 04 Y:2024 | 04 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,670 | $4,795 | n/a |
UF0621 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $106,203 | $322,608 | n/a |
UF0621 # 08 Y:2024 | 08 | 2024 | DEVELOP STANDARD OPERATING PROCEDURES | $15,000 | $700 | n/a |
UF0621 # 10 Y:2024 | 10 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $13,815 | $60,000 | n/a |
UF0621 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,063 | $456 | n/a |
UF0621 # 05 Y:2024 | 05 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,374 | $17,850 | n/a |
UF0621 # 09 Y:2024 | 09 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $15,000 | $3,868 | n/a |