IAC logo
IAC Assessment: UU0260
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0260
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2024
Principal Product Lower Limb Prosthetics
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 3842 - Surgical Appliances And Supplies
Sales $50,000,000-$100,000,000
# of Employees 70
Plant Area (Sq.Ft.) 26,000
Annual Production 70,000 Units
Production Hrs. Annual 2,085
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,515 1,435,118 kWh $0.04
Electricity Demand $70,490 5,754 kW-months/year $12.25
TOTAL ENERGY COSTS $122,005
RECOMMENDED SAVINGS* $46,878 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$27,825
Cost:
$247,680
$12,667 351,860 $15,158 1,237 - - $12,667
351,860
kWh
$15,158
1,237
kW-months/year
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$10,585
Cost:
$5,800
- - $10,585 864 - - -
-
kWh
$10,585
864
kW-months/year
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,696
Cost:
$8,277
$1,387 38,544 $809 66 $2,500 - $1,387
38,544
kWh
$809
66
kW-months/year
$2,500
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,557
Cost:
$6,277
$896 24,879 $1,661 136 - - $896
24,879
kWh
$1,661
136
kW-months/year
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$726
Cost:
$3,000
$726 20,176 - - - - $726
20,176
kWh
-
-
kW-months/year
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$489
Cost:
$1,818
$165 4,587 $324 26 - - $165
4,587
kWh
$324
26
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$46,878
Cost:
$272,852
$15,841 440,046 $28,537 2,329 $2,500 - $15,841
440,046
kWh
$28,537
2,329
kW-months/year
$2,500
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost