IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,167

matching recommendations
Reset
NAICS 3391 Medical Equipment and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2316 # 08 Y:2023 08 2023 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $22,194 $134,412 n/a
UC2316 # 07 Y:2023 07 2023 REPLACE BOILER $177,614 $423,535 n/a
UC2316 # 05 Y:2023 05 2023 REDUCE EXCESSIVE BOILER BLOWDOWN $2,801 $12,000 n/a
UC2316 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,167 $5,801 n/a
UC2316 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,355 $75 n/a
UC2316 # 03 Y:2023 03 2023 RECOVER AND REUSE WASTE MATERIAL $76,811 $332,613 n/a
UC2316 # 09 Y:2023 09 2023 INSTALL WIND POWERED ELECTRIC GENERATOR $1,380,736 $10,992,131 n/a
MI0429 # 06 Y:2023 06 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,831 $6,950 n/a
MI0429 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $1,608 $1,012 n/a
MI0429 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,739 $1,660 n/a
MI0429 # 07 Y:2023 07 2023 USE SOLAR HEAT TO HEAT WATER $1,687 $8,166 n/a
MI0429 # 03 Y:2023 03 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,267 $0 n/a
MI0429 # 04 Y:2023 04 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $16,344 $70,840 n/a
MI0429 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $172,404 $974,914 n/a
MI0429 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,166 $12,997 n/a
UU0231 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,898 $263,547 n/a
UU0231 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,519 $14,890 n/a
UU0231 # 01 Y:2023 01 2023 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $19,636 $127,500 n/a
UU0231 # 03 Y:2023 03 2023 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $6,518 $19,160 n/a
UU0231 # 04 Y:2023 04 2023 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $6,026 $30,128 n/a
UC2314 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,543 $0 n/a
UC2314 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,655 $1,283 n/a
UC2314 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $2,702 $800 n/a
UC2314 # 04 Y:2023 04 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,943 $21,500 n/a
UC2314 # 02 Y:2023 02 2023 PAY UTILITY BILLS ON TIME $3,211 $0 n/a