IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,150

matching recommendations
Reset
NAICS 3391 Medical Equipment and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0058 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $11,800 $250 Implemented
DL0058 # 06 Y:2010 06 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,400 $100 Not Implemented
DL0058 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,080 $6,300 Not Implemented
DL0058 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,000 $7,644 Implemented
DL0058 # 09 Y:2010 09 2010 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,200 $10,000 Not Implemented
DL0058 # 10 Y:2010 10 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,110 $18,280 Not Implemented
DL0058 # 11 Y:2010 11 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,215 $2,500 Not Implemented
DL0058 # 12 Y:2010 12 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,140 $5,050 Not Implemented
UD0821 # 01 Y:2010 01 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $4,575 $300,000 Implemented
UD0821 # 02 Y:2010 02 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,610 $25 Implemented
UD0821 # 03 Y:2010 03 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,331 $75 Not Implemented
UD0821 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,341 $60,300 Implemented
UD0821 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $479 $893 Implemented
UD0821 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,023 $4,000 Not Implemented
UD0821 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,766 $25 Not Implemented
UD0821 # 08 Y:2010 08 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $23,979 $43,700 Implemented
UD0821 # 09 Y:2010 09 2010 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $2,560 $5,542 Not Implemented
UD0821 # 10 Y:2010 10 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,772 $3,500 Implemented
UD0821 # 11 Y:2010 11 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $669 $400 Not Implemented
UF0434 # 01 Y:2010 01 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,268 $1,893 Not Implemented
UF0434 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,786 $4,195 Not Implemented
UF0434 # 03 Y:2010 03 2010 USE COMPRESSOR AIR FILTERS $1,326 $210 Not Implemented
UF0434 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,057 $401 Not Implemented
UF0434 # 05 Y:2010 05 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $18,101 $4,865 Not Implemented
UF0434 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,388 $0 Not Implemented