IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
NAICS 3391 Medical Equipment and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0068 # 05 Y:2011 05 2011 DISCONNECT BALLASTS $3,015 $607 Not Implemented
UA0068 # 01 Y:2011 01 2011 INSTALL TIMERS AND/OR THERMOSTATS $16,400 $5,100 Implemented
UA0068 # 02 Y:2011 02 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $15,438 $13,988 Implemented
UA0068 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,210 $4,238 Not Implemented
UA0068 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,451 $46,341 Implemented
UA0068 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $1,210 $2,719 Not Implemented
LE0325 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,946 $6,396 Implemented
LE0325 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,815 $15,840 Not Implemented
LE0325 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,654 $1,955 Not Implemented
LE0325 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,249 $15,615 Implemented
LE0325 # 04 Y:2011 04 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,438 $0 Not Implemented
LE0325 # 01 Y:2011 01 2011 USE HEAT PUMP FOR SPACE CONDITIONING $148,547 $900,000 Not Implemented
LE0325 # 02 Y:2011 02 2011 USE SOLAR HEAT TO HEAT WATER $52,419 $21,000 Not Implemented
DL0075 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $4,000 $5,000 Not Implemented
DL0075 # 04 Y:2011 04 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,900 $2,920 Not Implemented
DL0075 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $719 $1,100 Not Implemented
DL0075 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,400 $740 Not Implemented
DL0075 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,281 $5,000 Not Implemented
DL0075 # 01 Y:2011 01 2011 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $17,900 $6,660 Not Implemented
DL0075 # 05 Y:2011 05 2011 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $6,900 $9,250 Not Implemented
DL0075 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,000 $10,910 Not Implemented
DL0075 # 03 Y:2011 03 2011 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $14,910 $47,500 Not Implemented
MI0208 # 04 Y:2011 04 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,075 $2,550 Not Implemented
MI0208 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,241 $20,530 Not Implemented
MI0208 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,355 $1,320 Implemented